- 2078 Chaitra · 3 marks
Final settlement of clay, +30 kN/m²
Short answer
Effective stress at mid-height of the clay layer is (20−9.81)×4 + (18−9.81)×1.25 = 51.0 kPa. Final settlement Sc = (0.22×2.5/2.30) log10(81/51) ≈ 0.048 m, i.e., about 48 mm.
Calculate the final settlement of the clay layer as shown in the figure below due to an increase of pressure of 30 kN/m² at mid height of the layer. [Figure: sand layer 4 m thick, γ = 20 kN/m³, above a clay layer 2.5 m thick, γ = 18 kN/m³, e = 1.30, = 0.22.]
Assumptions: the figure is not available, so the water table is taken at the ground surface and the given values are saturated unit weights. kN/m³. The clay is normally consolidated and settlement is computed at mid-height of the clay (1.25 m below its top).
Ground ------------------------
Sand 4 m gamma = 20 kN/m3
------------------------
Clay 2.5 m gamma = 18, e = 1.30
Cc = 0.22 <- mid-height
Effective stress at mid-clay
Settlement, with kPa:
Answer: final settlement .
If there were no water table (both layers above it, kPa), the same formula gives about 26.7 mm.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Primary settlement, sand over clay, 110 kPa · Soil Mechanics, chapter 9
- Two-layer sand, plot stresses (bulk 18) · Soil Mechanics, chapter 6
- Two-layer profile stress diagram, 6 m sand · Soil Mechanics, chapter 6
- Clay 10 m, 2.54 cm sample, half settlement · Soil Mechanics, chapter 9
- Settlement with preconsolidation 125 kPa · Soil Mechanics, chapter 9
- Clay over sand, effective stress at depths · Soil Mechanics, chapter 6
- Differential settlement allowed, clay vs sand · Foundation Engineering, chapter 6
- Beam reactions, deflection, BMD (30 kN, 20 kN/m) · Computational Techniques in Civil Engineering, chapter 4 · asked 2×
- Wind pressure on roof truss, 20 m span, 30 deg · Design of Steel and Timber Structure, chapter 8
- Frame AFD, SFD, BMD (30 kN, 20 kN/m) · Strength of Materials, chapter 1