Skip to main content

Composite curve design, IP 1150 m, Rankine

Short answer

R=100.68 m, Ls=50 m, Ts=83.725 m, Lc=55.432 m. Chainages: TS 1066.275 m, SC 1116.275 m, CS 1171.707 m, ST 1221.707 m. Rankine deflection angles from SC: first sub-chord 3.725 m, δ=1°03′36″; then two 20 m chords, δ=5°41′27″ each; final sub-chord 11.707 m, δ=3°19′52″; cumulative deflection at CS=15°46′22″.

Design a composite curve with the following data: Deflection angle = 60°, Maximum speed of vehicle = 40 km/hr, centrifugal ratio = 1/8, rate of change of radial acceleration = 0.30 m/sec³, chainage of IP = 1150 m. Also calculate the setting out data of circular curve by Rankine's method. Take peg interval = 20 m.

Given data

Δ=60∘\Delta = 60^\circ, vmax=40v_{max} = 40 km/h =11.111= 11.111 m/s, centrifugal ratio v2/(gR)=1/8v^2/(gR) = 1/8, C=0.30C = 0.30 m/s³, chainage of IP =1150= 1150 m, peg interval 20 m.

Radius of the circular curve

v2gR=18⇒R=8v2g=8×11.11129.81=100.68 m\frac{v^2}{gR} = \frac{1}{8} \Rightarrow R = \frac{8v^2}{g} = \frac{8\times 11.111^2}{9.81} = 100.68\ \text{m}

Adopt R=100.68R = 100.68 m. (Rounding down to 100 m would make the centrifugal ratio slightly greater than the permitted 1/8.)

Length of transition

Ls=v3CR=11.11130.30×100.68=45.42 mL_s = \frac{v^3}{CR} = \frac{11.111^3}{0.30\times 100.68} = 45.42\ \text{m}

Adopt Ls=50L_s = 50 m.

Elements of the composite curve

s=Ls224R=50224×100.68=1.035 mθs=Ls2R=502×100.68=0.24831 rad=14.227∘Ts=(R+s)tan⁡30∘+Ls2=101.715×0.57735+25=83.725 mLc=R(Δ−2θs)=100.68(1.04720−0.49662)=55.432 m\begin{aligned} s &= \frac{L_s^2}{24R} = \frac{50^2}{24\times 100.68} = 1.035\ \text{m}\\ \theta_s &= \frac{L_s}{2R} = \frac{50}{2\times 100.68} = 0.24831\ \text{rad} = 14.227^\circ\\ T_s &= (R+s)\tan 30^\circ + \frac{L_s}{2} = 101.715\times 0.57735 + 25 = 83.725\ \text{m}\\ L_c &= R(\Delta - 2\theta_s) = 100.68\left(1.04720 - 0.49662\right) = 55.432\ \text{m} \end{aligned}
PointChainage (m)
TS = 1150 − 83.7251066.275
SC = TS + 501116.275
CS = SC + 55.4321171.707
ST = CS + 501221.707

Setting out the circular curve by Rankine's method (theodolite at SC)

δ=1718.87 c/R\delta = 1718.87\,c/R minutes for chord cc; the first sub-chord runs to the next 20 m peg and the last sub-chord ends at CS.

Point (chainage, m)Chord c (m)δ = 1718.87c/RCumulative deflection
1116.275--0°00′00″
1120.0003.7251°03′36″1°03′36″
1140.00020.0005°41′27″6°45′03″
1160.00020.0005°41′27″12°26′30″
1171.70711.7073°19′52″15°46′22″

Check: last cumulative deflection =(Δ−2θs)/2=(60∘−28.454∘)/2=15.773∘= (\Delta - 2\theta_s)/2 = (60^\circ - 28.454^\circ)/2 = 15.773^\circ = 15°46′22″.

For reference, the transition (set out from TS), α=573l2/(RLs)\alpha = 573l^2/(RL_s) minutes:

Point (chainage, m)l from TS (m)α (min)α (° ′ ″)
1066.2750.0000.00′0°00′00″
1080.00013.72521.44′0°21′27″
1100.00033.725129.46′2°09′28″
1116.27550.000284.56′4°44′34″

(At SC, θs/3=4.742∘\theta_s/3 = 4.742^\circ = 4°44′33″; the 1″ difference comes from rounding 572.96 to 573.)

Answer: R=100.68R = 100.68 m, Ls=50L_s = 50 m, Ts=83.725T_s = 83.725 m, Lc=55.432L_c = 55.432 m; TS = 1066.275 m, SC = 1116.275 m, CS = 1171.707 m, ST = 1221.707 m; Rankine deflection angles as tabulated.

✓ Answer checked by Claude Opus 5.5 (high effort)