- 2082 Bhadra · 6 marks
Flood of return period T using log-normal distribution
Short answer
Take logs of annual maxima, compute mean ȳ and standard deviation S_y. For return period T with probability P=1/T, find the standard normal variate z_T. Then log flood y_T = ȳ + z_T S_y, and x_T = 10^(y_T).
If the annual flood series data for a catchment is available for N consecutive years, explain a procedure to determine a flood discharge with a return period of T (where T>N), by using log-normal distribution.
Log-normal distribution. The logarithm of the annual flood is assumed to be normally distributed. The flood of a given return period is then found using the standard normal variate in place of the frequency factor.
Procedure (N years of annual maxima, T > N)
- Arrange the annual flood series and take logarithms, (or ln).
- Compute the mean and standard deviation of the log series:
- Compute the exceedance probability and the non-exceedance probability .
- Find the standard normal variate corresponding to from the standard normal table (the frequency factor of the log-normal distribution, ). A good approximation is with for . For example, for T = 50 years and for T = 100 years.
- Compute the log of the flood of return period T:
- Convert back to get the flood:
- As a check, plot the points with Weibull positions on log-normal probability paper; the data should be close to a straight line, which can be extended to T for a graphical result.
The result is an extrapolation beyond the record (T > N), so confidence limits should be considered; the log-normal distribution is a special case of log-Pearson III with zero skew.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Prove mean annual flood has 2.33-year return period · Engineering Hydrology, chapter 6
- Return period of 350 m3/s design flood by Gumbel · Engineering Hydrology, chapter 6 · asked 2×
- Gumbel return period and confidence limit · Engineering Hydrology, chapter 6 · asked 2×
- Flood estimation by Log Pearson III method · Engineering Hydrology, chapter 6 · asked 3×
- Gumbel flood for 500-year return period · Engineering Hydrology, chapter 6
- Gumbel design flood, 21 years data, 40-year life · Engineering Hydrology, chapter 6 · asked 3×
- Demand of rural municipality, base period 3 years · Water Supply Engineering, chapter 3
- Demand of village 2070 BS, base period 5 years · Water Supply Engineering, chapter 3
- Flood lighting procedure and 50 × 15 m frontage · Industrial Power Distribution and Illumination, chapter 8
- Trip time normal distribution probabilities · Transportation Engineering II, chapter 1