- 2081 Bhadra · 6 marks
Surface runoff with initial loss and phi-index, 100-min storm
Short answer
After subtracting initial loss of 0.6 cm from early rain, φ-index losses of 0.2 cm per 20-min interval applied to remaining rainfall yielded excess depths summing to 2.1 cm, so total surface runoff = 2.1 cm.
The mass curve of the rainfall of 100 min duration is given below. If the catchment had an initial loss of 0.6 cm and -index of 0.6 cm/hr, calculate the total surface runoff from the catchment.
| Time from start of rainfall (min) | 0 | 20 | 40 | 60 | 80 | 100 |
|---|---|---|---|---|---|---|
| Cumulative rainfall (cm) | 0 | 0.5 | 1.2 | 2.6 | 3.3 | 3.5 |
Rainfall in each 20-minute interval (difference of the mass curve):
| Interval (min) | 0-20 | 20-40 | 40-60 | 60-80 | 80-100 |
|---|---|---|---|---|---|
| Rain (cm) | 0.5 | 0.7 | 1.4 | 0.7 | 0.2 |
loss per 20 min cm.
The initial loss of 0.6 cm is satisfied first: all 0.5 cm of interval 1 and 0.1 cm of interval 2. After that the loss is applied.
| Interval | Rain after initial loss (cm) | loss (cm) | Excess (cm) |
|---|---|---|---|
| 1 | 0 | 0 | 0 |
| 2 | 0.6 | 0.2 | 0.4 |
| 3 | 1.4 | 0.2 | 1.2 |
| 4 | 0.7 | 0.2 | 0.5 |
| 5 | 0.2 | 0.2 | 0 |
| Total | 2.1 |
Check: total rain 3.5 - initial loss 0.6 - infiltration (0.2 + 0.2 + 0.2 + 0.2 = 0.8) = 2.1 cm.
Answer: Total surface runoff = 2.1 cm (depth over the catchment).
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Phi-index and rainfall excess duration from mass curve · Engineering Hydrology, chapter 3
- Phi-index from mass curve, 3.5 cm runoff · Engineering Hydrology, chapter 3
- Total rainfall, net runoff, W-index of 140-min storm · Engineering Hydrology, chapter 3 · asked 2×
- Total rainfall, net runoff, W-index of 120-min storm · Engineering Hydrology, chapter 3 · asked 2×
- Phi-index and rainfall excess duration, 0.340 Mm3 runoff · Engineering Hydrology, chapter 3 · asked 2×
- Phi-index of storm, 20 cm rain, 12 cm runoff · Engineering Hydrology, chapter 3
- Storm water from a 45 ha catchment · Sanitary Engineering, chapter 2