Earthwork excavation in soft soil and hard soil

Short answer

Soft soil excavation uses spades and machines, is fast and cheap, needs slopes or shoring, often dewatering, and compaction of the bottom. Hard soil needs picks, crowbars, pneumatic drills or blasting, is slow and costly, but sides stand well and little water is encountered.

Compare earthwork excavation for foundation in soft soil and hard soil.

PointSoft soilHard soil (hard / rocky)
ToolsSpade, pick axe, shovel, mechanical excavatorPick axe, crowbar, chisel, pneumatic drill; blasting for rock
Rate of workFastSlow
CostLowHigh
SidesTend to cave in; need slopes or shoringGenerally stand without support
WaterOften high water table; dewatering neededLittle water problem
Excavation depthDeeper, to reach firm strataShallow, since bearing is good already
SafetyCollapse riskRisk from blasting, flying fragments
DisposalEasily handled, may be reused for fillingHeavy rock pieces, need transport; can be used as aggregate
BottomNeeds compaction or a PCC bedNeeds levelling and cleaning, benching