Skip to main content

Paints, varnishes, painting procedures

Short answer

Paint: mixture of pigment, vehicle, thinner forms opaque protective film. Varnish: resin in solvent, hard transparent gloss. Oil paint constituents: base (opacity), vehicle (linseed oil), pigment, drier, thinner, extender. New wood: knot, prime, putty, undercoat, finish; old: strip, spot prime; metal: rust removal, red oxide primer; cement: dry plaster, alkali primer, two coats (cement paint cured).

Define paint and varnishes used in the building. Illustrate the constituents of an oil paint. Describe the painting procedures on; new and old woodworks, metal works and cement surfaces.

Paint and varnish

  • Paint: a mixture of pigment, vehicle and thinner that forms an opaque, coloured, protective film on a surface when dry.
  • Varnish: a solution of resin (lac, copal, rosin) in a solvent (turpentine, spirit or oil) which dries to a hard, glossy, transparent film. It protects woodwork and brings out its natural grain. Types: oil varnish, spirit varnish, turpentine varnish, water varnish.

Constituents of oil paint

IngredientExampleFunction
BaseWhite lead, zinc white, titanium dioxide, red oxideGives body, opacity and covering power
Vehicle (carrier)Linseed oil, tung oil, poppy-seed oilCarries the pigment, spreads and dries to a hard film
PigmentIron oxide (red), chrome (yellow), carbon black, ultramarineGives colour
DrierLitharge, red lead, manganese saltsSpeeds up drying of the oil
Thinner (solvent)Turpentine, mineral spiritMakes the paint workable; evaporates after application
Extender (adulterant)Barytes, gypsum, china clayAdds bulk, reduces cost

Painting procedures

1. New woodwork
  1. Rub the surface with sandpaper; seal knots with knotting (shellac).
  2. Apply a priming coat (red lead with linseed oil); allow 24 hours to dry.
  3. Fill holes and cracks with putty; sand smooth.
  4. Apply one or two undercoats, sandpapering each after it dries.
  5. Apply one or two finishing coats of the final colour.
2. Old woodwork
  1. Remove old peeling paint by scraping, a blow lamp or paint remover; wash and dry.
  2. Rub down with sandpaper and fill defects with putty.
  3. Spot-prime bare areas.
  4. Apply undercoat and then finishing coats as for new work.
3. Metal work

Remove rust and scale with a wire brush or sandpaper; apply a red oxide or zinc chromate primer; apply an undercoat after 24 hours; finish with one or two coats of enamel or synthetic paint.

4. Cement/plastered surfaces

The plaster must be dry (3-4 weeks old). Remove dust and efflorescence, apply an alkali-resistant primer, fill defects with wall putty, and apply two or more coats of emulsion, distemper or cement paint (wetting the surface before cement paint and curing it afterwards).

✓ Answer checked by Claude Opus 5.5 (high effort)

All Building Technology chapter 9 questions →