Types and design of ventilation

Short answer

Types include natural (wind/stack), mechanical (extract/plenum/balanced), and mixed mode. Design: find occupant number or air change rate, compute required flow, size openings for natural or fan capacity for mechanical.

Explain different types of ventilation and their design (design methodology of ventilation).

Ventilation is the supply of fresh air to, and removal of stale air from, an enclosed space.

Types of ventilation

  1. Natural ventilation: Uses wind pressure and stack (thermal) effect through openings.
    • Wind-driven (cross) ventilation: windows on windward and leeward sides.
    • Stack effect: warm air rises and leaves through high openings (ventilators, ridge, chimney), and cool air enters low.
  2. Mechanical (forced) ventilation: Fans and ducts are used.
    • Extract (exhaust) system: fan removes air; used in kitchens, toilets.
    • Plenum / supply system: fan forces fresh air in.
    • Balanced system: both supply and exhaust fans.
  3. Combined (mixed mode).

Mechanical ventilation is preferred where natural ventilation cannot give the needed rate: basements, large halls, interior rooms, kitchens, workshops.

Design methodology

  1. Find the number of occupants and the use, then the required fresh-air rate (e.g. 25 to 30 m³/h per person) or the air change rate (ACH) from the code.
  2. Required flow: Q=V×N3600Q = \frac{V \times N}{3600} (m³/s), where VV is room volume and NN is ACH.
  3. Natural: Wind flow Q=EAVQ = E A V (m³/s), with EE effectiveness (0.5 to 0.6 for wind perpendicular to opening, 0.25 to 0.35 diagonal), AA open area, VV wind speed (m/s). Stack flow: Q=CdA2ghTi−ToTiQ = C_d A \sqrt{2 g h \frac{T_i - T_o}{T_i}}.
  4. Fix opening areas (generally 15 to 20 % of floor area) and locate inlets low and outlets high, on opposite walls.
  5. Mechanical: Choose fan capacity for QQ, size ducts for 3 to 6 m/s, and select grilles.
  6. Check the result against the Nepal National Building Code (NBC 206).