Priority and SJF scheduling with P4 and P5

Short answer

Preemptive priority: AWT = 8 ms, ATAT = 13.8 ms. Preemptive SJF (SRT): AWT = 6.2 ms, ATAT = 12 ms.

Three processes with process ID P1, P2, P3 with estimated completion time 4, 10, 5 ms and priorities 1, 4, 3 respectively enter the ready queue together. New process P4 with estimated completion time 3 ms and priority 2 enters the ready queue after 5 ms of start of operation and P5 with estimated completion time 7 ms and priority 0 enters the ready queue after 2 ms of start of P4. Calculate WT, TAT for each process and calculate AWT and ATAT using preemptive priority-based and shortest job first scheduling algorithms.

Preemptive priority

Assumed: P1, P2, P3 arrive at 0; P4 arrives at 5 ms; P5 arrives 2 ms after P4, i.e. at 7 ms. Lower priority number means higher priority. Burst times 4, 10, 5, 3, 7 ms; priorities 1, 4, 3, 2, 0.

Gantt chart

| P1 | P3 | P4 | P5 | P4 | P3 | P2 |
0    4    5    7    14   15   19   29

Trace

  • 0-4: P1 (priority 1, best of the three) runs and finishes.
  • 4-5: P3 (priority 3) runs; it beats P2 (priority 4).
  • 5: P4 (priority 2) arrives and preempts P3 (4 ms left).
  • 7: P5 (priority 0) arrives and preempts P4 (1 ms left).
  • 7-14: P5 runs to completion.
  • 14-15: P4 finishes; 15-19: P3 finishes; 19-29: P2 runs.

Calculation

TAT = completion time - arrival time; WT = TAT - burst time.

ProcessATBTCTTAT = CT - ATWT = TAT - BT
P104440
P2010292919
P305191914
P45315107
P5771470

AWT = (0 + 19 + 14 + 7 + 0) / 5 = 40/5 = 8 ms

ATAT = (4 + 29 + 19 + 10 + 7) / 5 = 69/5 = 13.8 ms

Answer: AWT = 8 ms, ATAT = 13.8 ms.

Shortest job first (preemptive)

Shortest job first, applied in its preemptive form (shortest remaining time first). The CPU always runs the process with the smallest remaining burst; priorities are ignored.

Gantt chart

| P1 | P3 | P4 | P3 | P5 | P2 |
0    4    5    8    12   19   29

Trace

  • 0-4: P1 (4 ms) is the shortest and finishes.
  • 4-5: P3 (5 ms) runs, as P2 needs 10 ms.
  • 5: P4 (3 ms) arrives; P3 has 4 ms left, so P4 preempts it.
  • 5-8: P4 finishes. At 7, P5 (7 ms) arrives but is longer than the remaining 1 ms of P4, so no preemption.
  • 8-12: P3 (4 left) finishes; 12-19: P5 (7 ms); 19-29: P2.

Calculation

TAT = completion time - arrival time; WT = TAT - burst time.

ProcessATBTCTTAT = CT - ATWT = TAT - BT
P104440
P2010292919
P30512127
P453830
P57719125

AWT = (0 + 19 + 7 + 0 + 5) / 5 = 31/5 = 6.2 ms

ATAT = (4 + 29 + 12 + 3 + 12) / 5 = 60/5 = 12 ms

Answer: AWT = 6.2 ms, ATAT = 12 ms.

If non-preemptive SJF is meant instead, the order is P1, P3, P4, P5, P2 (finish 4, 9, 12, 19, 29), giving AWT = (0+4+4+5+19)/5 = 6.4 ms and ATAT = (4+9+7+12+29)/5 = 12.2 ms.

Comparison

SJF (AWT 6.2 ms) gives a lower average waiting time than priority scheduling (AWT 8 ms) here, because it always favours the shortest remaining work.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Embedded System chapter 6 questions →