- 2066 Magh · 4 marks
BEP volume and effect of price rise
Short answer
Assuming corrected selling price Rs 80,000/unit, contribution Rs 30,000. BEP = 60,000,000 ÷ 30,000 = 2,000 units. With 20% price rise to Rs 96,000, new BEP = 60,000,000 ÷ 46,000 ≈ 1,305 units and profit rises by Rs 16,000 per unit.
Fixed cost = Rs. 60 million, Variable cost/unit = Rs. 50,000, Selling price/unit = Rs. 8,000. Find BEP volume. What would be the effect on profit/loss when selling price increases by 20%?
Assumption
As printed, the selling price (Rs 8,000) is lower than the variable cost (Rs 50,000), so every unit sold loses money and no break-even exists. The price is taken as a misprint for Rs 80,000 per unit (the alternative reading, v = Rs 5,000, is given at the end).
Break-even volume
Contribution per unit = p − v = 80,000 − 50,000 = Rs 30,000 Q* = FC / (p − v) = 60,000,000 / 30,000 = 2,000 units (Break-even sales = 2,000 × 80,000 = Rs 160 million.)
Effect of a 20% price rise
New price p' = 80,000 × 1.20 = Rs 96,000 New contribution = 96,000 − 50,000 = Rs 46,000 New break-even Q' = 60,000,000 / 46,000 = 1,304.3, about 1,305 units
Effect on profit at any volume Q: profit increases by (96,000 − 80,000) × Q = Rs 16,000 per unit sold. At the old break-even volume of 2,000 units, profit changes from nil to 2,000 × 46,000 − 60,000,000 = Rs 32 million profit.
Break-even falls by 695.7 units (34.8%), so the project becomes less risky and more profitable.
Answer: BEP = 2,000 units; after a 20% price rise BEP = about 1,305 units and profit rises by Rs 16,000 per unit sold (Rs 32 million at 2,000 units).
If instead v = Rs 5,000 and p = Rs 8,000: BEP = 60,000,000 / 3,000 = 20,000 units; new p = 9,600 gives BEP = 60,000,000 / 4,600 = 13,043 units.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- BEP volume; effect of cost changes · Engineering Economics, chapter 1
- Break-even units and output for desired profit · Engineering Economics, chapter 1
- EVA; 60 days, 25% work, Rs 12,00,000 · Project Engineering, chapter 4
- Capitalised value from Rs 20,000 monthly rent · Construction Management, chapter 13
- Cutting volume, 60 m, GL 1181.50, formation 1179.00 · Surveying I, chapter 9 · asked 8×