Peak flow (design flood) is the maximum discharge expected at a site for a chosen return period. It is needed to design the spillway, diversion works, cofferdams and river training works of a hydropower project.

1. Empirical methods

They relate peak flow mainly to catchment area AA (km²) with a regional constant. Simple but only valid in the region where they were developed.

FormulaEquationRemarks
Dicken'sQp=CDA3/4Q_p = C_D A^{3/4}North India; CDC_D = 6 to 30 (11–14 for hilly areas)
RyvesQp=CRA2/3Q_p = C_R A^{2/3}South India; CRC_R = 6.8 to 10.1
InglisQp=124AA+10.4Q_p = \dfrac{124A}{\sqrt{A + 10.4}}Fan-shaped catchments, Maharashtra
RationalQp=CIA3.6Q_p = \dfrac{CIA}{3.6}Small catchments; I in mm/h, A in km²

In Nepal, regional methods such as WECS/DHM (1990) and modified Dicken's are commonly used, e.g. Q100=14.63 (A3000+1)0.7342Q_{100} = 14.63\,(A_{3000} + 1)^{0.7342}, where A3000A_{3000} is the catchment area (km²) below 3000 m elevation.

Example: A=500A = 500 km², CD=11C_D = 11: Qp=11×5000.75=11×105.7=1163Q_p = 11 \times 500^{0.75} = 11 \times 105.7 = 1163 m³/s.

2. Gumbel's extreme value distribution

A statistical method using the annual maximum flood series (one peak per year for N years).

Steps:

  1. Find mean xˉ\bar{x} and standard deviation σn−1\sigma_{n-1} of the annual peaks.
  2. Reduced variate for return period T:
yT=−ln⁡[ln⁡(TT−1)]y_T = -\ln\left[\ln\left(\frac{T}{T-1}\right)\right]
  1. Frequency factor:
K=yT−yˉnSnK = \frac{y_T - \bar{y}_n}{S_n}

where yˉn\bar{y}_n and SnS_n are the reduced mean and reduced standard deviation from Gumbel's table for sample size N (for very large N, yˉn=0.577\bar{y}_n = 0.577, Sn=1.2825S_n = 1.2825). 4. Flood of return period T:

xT=xˉ+Kσn−1x_T = \bar{x} + K\sigma_{n-1}
  1. Optionally plot on Gumbel probability paper and give confidence limits.

Example: xˉ=800\bar{x} = 800 m³/s, σ=250\sigma = 250 m³/s, large N, T=100T = 100 yr: yT=4.600y_T = 4.600, K=(4.600−0.577)/1.2825=3.137K = (4.600 - 0.577)/1.2825 = 3.137, x100=800+3.137×250=1584x_{100} = 800 + 3.137 \times 250 = 1584 m³/s.

PointEmpiricalGumbel
Data neededArea onlyLong flood record
Return periodNot explicitAny T
AccuracyRoughBetter