- Asked 4/20
- 2069 Bhadra · 8 marks
Power/light sub-circuits and cable for 50 kW, 60 kW
Short answer
Light sub-circuits: ≤10 points/800 W, 1.5 mm² Cu, 6-10 A MCB; power sub-circuits: ≤2 sockets/3 kW, 2.5-4 mm² Cu, 16-20 A MCB. For SDB1 (50 kW, 90.2 A, 60 m): 25 mm² Cu (99 A, 1.33% drop). For SDB2 (60 kW, 108.3 A, 100 m): 35 mm² Cu (120 A, 1.91% drop).
What are the power and light sub circuits in an electrification of building? Determine the size of cable used from MDB to SDB1 and SDB2, if the total power on SDB1 and SDB2 are 50 kW and 60KW, respectively. The distance between MDB to SDB1 and SDB2 are 60m and 100m respectively. The supply system is 3phase 4wire system with 400V, 50Hz. Current ratings of 3.5 core copper conductor cable for laid in ground are given below.
| Conductor area (sq.mm) | 1.5 | 2.5 | 4 | 6 | 10 | 16 | 25 | 35 | 50 | 70 | 95 | 120 | 150 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 3.5 core cable current rating (A) | 21 | 27 | 31 | 45 | 60 | 77 | 99 | 120 | 145 | 175 | 210 | 240 | 270 |
Light and power sub-circuits
A sub-circuit is a branch circuit taken from a distribution board (DB) through its own fuse/MCB to feed a group of points. In building wiring the points are split into two separate kinds of sub-circuit:
- Light sub-circuit: feeds lamps, fans and 6 A (5 A) socket points. As per IS 732 / NEA practice it carries at most 10 points or 800 W, is wired in 1.5 mm² Cu and is protected by a 6 A (or 10 A) MCB.
- Power sub-circuit: feeds 16 A (15 A) power sockets for heaters, irons, AC, machines, etc. It carries at most 2 power sockets (about 3000 W), is wired in 2.5–4 mm² Cu and protected by a 16–20 A MCB.
- The two are kept on separate circuits (often separate DBs) so that a fault or overload on a power point does not plunge the area into darkness, and so that each can be sized for its own current.
Cable size from MDB to SDB1 and SDB2
Assumptions: power factor 0.8 lagging; Cu resistivity 0.0178 Ω·mm²/m; permissible voltage drop 2.5 % of 400 V (= 10 V) on a sub-main.
Current: I = P / (√3 × V_L × cos φ)
SDB1: I1 = 50000 / (√3 × 400 × 0.8) = 90.21 A
SDB2: I2 = 60000 / (√3 × 400 × 0.8) = 108.25 A
From the table (3.5-core Cu, laid in ground):
- SDB1: 90.21 A → 25 mm² (rating 99 A)
- SDB2: 108.25 A → 35 mm² (rating 120 A)
Voltage drop check: ΔV = √3 × I × R × cos φ, with R = ρL/A (reactance neglected).
SDB1: R = 0.0178 × 60 / 25 = 0.0427 Ω
ΔV = √3 × 90.21 × 0.0427 × 0.8 = 5.34 V
= 5.34/400 = 1.33 % < 2.5 % OK
SDB2: R = 0.0178 × 100 / 35 = 0.0509 Ω
ΔV = √3 × 108.25 × 0.0509 × 0.8 = 7.63 V
= 7.63/400 = 1.91 % < 2.5 % OK
Answer: MDB → SDB1: 3.5-core 25 mm² Cu cable; MDB → SDB2: 3.5-core 35 mm² Cu cable.
Note: if a 25 % margin for future load is added (1.25 × I = 112.76 A and 135.32 A), the sizes become 35 mm² and 50 mm² respectively.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cable size MDB to SDB1 (80 kW) and SDB2 (10 kW) · Industrial Power Distribution and Illumination, chapter 5 · asked 5×
- Cable size MDB to SDB1 (70 kW) and SDB2 (90 kW) · Industrial Power Distribution and Illumination, chapter 5 · asked 5×
- Cable size MDB to SDB-1 (60 kW) and SDB-2 (75 kW) · Industrial Power Distribution and Illumination, chapter 5 · asked 4×
All Industrial Power Distribution and Illumination chapter 5 questions →