Preventive measures include canal lining, controlled irrigation, and improving natural drainage. Remedial measures involve surface drains, subsurface tile or mole drains, and vertical drainage via tube wells to lower the water table.
Describe various methods adopted as anti-waterlogging measures.
Anti-waterlogging measures are the steps taken to prevent the water table from rising, and to reclaim land that is already waterlogged.
1. Preventive measures
- Lining of canals and water courses to reduce seepage losses.
- Controlled irrigation: supply only the crop requirement, with a proper irrigation interval (avoid over-watering).
- Efficient water management: rotational supply (warabandi), farmer training, volumetric charges.
- Improving the natural drainage: clearing, deepening and straightening natural streams; providing cross-drainage works of adequate waterway so that roads, canals and embankments do not obstruct flow.
- Intensity of irrigation limited to the available drainage capacity; avoiding unlined canals on high-seepage ground; and a good cropping pattern.
- Interceptor drains along the canal.
2. Remedial (reclamation) measures
- Surface drains: open field, collector and main drains.
- Subsurface drains: tile or pipe drains and mole drains, to lower the water table to a safe depth (about 1.5 m or more).
- Vertical drainage: tube wells or pump wells; pumped water is reused for irrigation.
- Biological drainage: deep-rooted trees such as eucalyptus along canals and fields.
- Land levelling and construction of embankments against floods.
Prevention is cheaper than cure; a combination of lining and surface drains is generally adopted, with tile drains or tube wells for severely affected areas.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Water logging remedies and surface drainage in Terai · Irrigation and Drainage Engineering, chapter 9
- Fecal-oral route and preventive measures · Water Supply Engineering, chapter 4
All Irrigation and Drainage Engineering chapter 9 questions →