Khosla: uplift pressures, slope correction 6.5

Short answer

Khosla method with slope correction 6.5% for head 5.50m and three piles yields corrected uplifts: C1 70.2% (3.86m), E2 65.4% (3.60m), C2 55.6% (3.06m), E3 29.7% (1.63m). Exit gradient = 0.156 (1 in 6.4).

Using Khosla's method, calculate the uplift pressures at various key points in the figure below. Also, determine the exit gradient. Take the slope correction factor as 6.5.

[Figure: not reproduced in the scan]

The figure is not available, so the weir profile of the standard case (pond 102.50 m, 2:1 slopes, three pile lines) is used to show the method.

Data and assumptions

The figure is read as follows. Pond level 102.50 m; with no flow the d/s water level is taken at the d/s floor level 97.00 m, so H=5.50H = 5.50 m. Piles (positions measured from the u/s pile): u/s pile at 0 m, floor level 100.00 m, bottom 94.00 m (d=6d = 6 m); intermediate pile at 15 m, floor level 99.00 m, bottom 94.00 m (d=5d = 5 m); d/s pile at 45 m, floor level 97.00 m, bottom 92.00 m (d=5d = 5 m). Total floor length b=45b = 45 m. Floor thickness is not given, so the thickness correction is neglected. The 2:1 slope correction is 6.5%, multiplied by (slope length / b′b'), where b′b' is the distance between the two piles enclosing the slope: u/s slope (2 m, up slope, b′=15b' = 15 m): −6.5×2/15-6.5\times 2/15 at C1C_1; d/s glacis (101.00 to 98.00 m, 6 m long, down slope, b′=30b' = 30 m): +6.5×6/30+6.5\times 6/30 at E3E_3.

Khosla's constants

End piles: α=b/d\alpha = b/d, λ=1+1+α22\lambda = \dfrac{1+\sqrt{1+\alpha^2}}{2}, ϕE=1πcos⁡−1λ−2λ\phi_E = \dfrac{1}{\pi}\cos^{-1}\dfrac{\lambda-2}{\lambda}, ϕD=1πcos⁡−1λ−1λ\phi_D = \dfrac{1}{\pi}\cos^{-1}\dfrac{\lambda-1}{\lambda} (in percent), b=45b = 45 m; for the u/s pile ϕD1=100−ϕD\phi_{D1} = 100-\phi_D, ϕC1=100−ϕE\phi_{C1} = 100-\phi_E.

Intermediate pile (b1b_1 from the u/s end, b2b_2 from the d/s end): λ1=1+α12−1+α222\lambda_1 = \dfrac{\sqrt{1+\alpha_1^2}-\sqrt{1+\alpha_2^2}}{2}, λ=1+α12+1+α222\lambda = \dfrac{\sqrt{1+\alpha_1^2}+\sqrt{1+\alpha_2^2}}{2}, ϕE=1πcos⁡−1λ1−1λ\phi_E = \dfrac{1}{\pi}\cos^{-1}\dfrac{\lambda_1-1}{\lambda}, ϕD=1πcos⁡−1λ1λ\phi_D = \dfrac{1}{\pi}\cos^{-1}\dfrac{\lambda_1}{\lambda}, ϕC=1πcos⁡−1λ1+1λ\phi_C = \dfrac{1}{\pi}\cos^{-1}\dfrac{\lambda_1+1}{\lambda}.

Piled (m)αλφE (%)φD (%)
U/s pile6.007.5004.28332.1022.20
D/s pile5.009.0005.02829.4320.42
Intermediate piled (m)α1α2λ1λφE (%)φD (%)φC (%)
at 15 m5.003.0006.000-1.4604.62367.8660.2353.17

Pressures at the key points

Pressure is expressed as a percentage of the head H=5.50H = 5.50 m (no flow).

PointSimple φ (%)Corrections (%)Corrected φ (%)Pressure head (m)
E1 (top of u/s pile)100.000100.005.50
D177.80-77.804.28
C167.90int +3.20, slope -0.8770.233.86
E267.86int -2.4465.433.60
D260.23-60.233.31
C253.17int +2.4555.623.06
E329.43int -1.07, slope +1.3029.661.63
D320.42-20.421.12
C3 (d/s end)0000

Corrections: int = mutual interference, 19D/b′ d+Db19\sqrt{D/b'}\,\dfrac{d+D}{b}, positive at C of the u/s pile and negative at E of the d/s pile of each pair (DD = depth of the neighbouring pile below the floor level at the pile being corrected, b′b' = distance between the two piles); slope = slope correction. The D points are not corrected.

Floor thickness

Unbalanced head hh = hydraulic-gradient level at the floor −- floor top level; required thickness t=hG−1t = \dfrac{h}{G-1} with G=2.40G = 2.40 (the HGL is taken straight between the corrected key points along the floor).

Locationx (m)φ (%)HG level (m)Floor top (m)Unbalanced head (m)Required t (m)Provided t (m)Check
C1 (u/s)070.23100.86100.000.860.62-provide at least 0.62
E2 (int. pile)1565.43100.6099.001.601.14-provide at least 1.14
C2 (int. pile)1555.62100.0699.001.060.76-provide at least 0.76
E3 (d/s)4529.6698.6397.001.631.17-provide at least 1.17

Exit gradient

GE=Hd⋅1πλ=5.505.00×1π5.028=0.1562 (≈1/6.4)G_E = \frac{H}{d}\cdot\frac{1}{\pi\sqrt{\lambda}} = \frac{5.50}{5.00}\times\frac{1}{\pi\sqrt{5.028}} = 0.1562\ (\approx 1/6.4)

Permissible (assumed) =0.2000= 0.2000. Safe (less than the permissible value).

Answer: The uplift pressures are the corrected values in the table (as % of HH and in metres of water): C1=70.2%C_1 = 70.2\%, E2=65.4%E_2 = 65.4\%, D2=60.2%D_2 = 60.2\%, C2=55.6%C_2 = 55.6\%, E3=29.7%E_3 = 29.7\%, D3=20.4%D_3 = 20.4\%. The exit gradient is about 1 in 6.4.