- 2079 Chaitra · 4+4 marks
Biological treatment principles; grit vs sedimentation
Short answer
Biological treatment uses microorganisms (mainly bacteria) to oxidize organic matter (BOD) and produce new cells under aerobic conditions, controlled by F\/ M, sludge age and oxygen. Grit chambers remove heavy inorganic grit (specific gravity2.65, size >0.15 mm) with high flow velocity (0.2–0.3 m\/ s) and short detention (30–60 s), whereas sedimentation tanks settle fine organic solids (gravity ~1.2) at very low velocity (~0.005 m\/ s) over2–3 hours.
Explain briefly the principles of biological wastewater treatment. Enlist the differences between grit chamber and sedimentation tank.
Principles of biological wastewater treatment
Biological treatment removes dissolved and colloidal organic matter by the metabolic action of micro-organisms, mainly bacteria.
- Food and organisms: the organic matter (BOD) of sewage is the food for the bacteria. They need oxygen (aerobic process), nutrients (N and P), pH of 6.5-8.5 and temperature of 20-35°C.
- Oxidation (energy):
- Synthesis (growth):
- Endogenous respiration: when food runs short the cells oxidise their own mass, .
- The new cells are removed as sludge by settling, leaving a clear effluent with low BOD.
- Anaerobic treatment (no oxygen) gives methane and CO₂ and is used for sludge digestion and strong wastes.
- The process is operated as suspended growth (activated sludge) or attached growth (trickling filter, RBC), controlled by the ratio, sludge age, oxygen supply and temperature.
Differences between grit chamber and sedimentation tank
| Point | Grit chamber | Sedimentation tank |
|---|---|---|
| Purpose | Removes heavy inorganic grit (sand, gravel, cinders) | Removes settleable organic and fine suspended solids |
| Particle size / | About 0.15 mm and above, | Fine particles, or less |
| Position | Before the sedimentation tank (after screens) | After the grit chamber |
| Flow velocity | About 0.2-0.3 m/s, kept constant | Very low, about 0.3 m/min (about 0.005 m/s) |
| Detention time | 30-60 seconds | 2-3 hours (primary) |
| Size | Small, narrow, long channel | Large rectangular or circular tank |
| Velocity control | Needed (proportional weir or Parshall flume) | Not critical |
| Sludge | Dry, inert grit; removed by hand or scraper | Wet putrescible sludge (about 95% water) needing digestion |
| Surface loading | High, 800-1200 m³/m²/day | Low, 25-40 m³/m²/day |
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Skimming tank; grit vs sedimentation tank · Sanitary Engineering, chapter 7
- Grit chamber for 190 l/s · Sanitary Engineering, chapter 7 · asked 2×
- Rectangular grit chamber for 10 MLD · Sanitary Engineering, chapter 7
- Grit chamber for 180 l/s, SOR 1.5 · Sanitary Engineering, chapter 7
- Grit chamber: purpose, construction, design · Sanitary Engineering, chapter 7 · asked 4×
- Grit chamber for 60 MLD, 0.23 mm · Sanitary Engineering, chapter 7 · asked 2×
- Treatment process; sedimentation factors; coagulants · Water Supply Engineering, chapter 6
- Municipal wastewater treatment plant · Environment and Pollution Control, chapter 4
- Rectangular sedimentation tank, 9 million L peak demand · Water Supply Engineering, chapter 6
- Rectangular sedimentation tank, 20000 population, 0.4 mm/s · Water Supply Engineering, chapter 6