Skip to main content

Shear design with curtailed bars, 30x45 cm

Short answer

Factored shear Vu = 150 kN. After curtailment (3-20 mm bars), Vc = 73.4 kN, Vus = 76.6 kN. Stirrups at 125 mm c/c for shear. At cut-off section, 2/3(Vc+Vus) = 101.4 kN < Vu, so excess stirrups required: 8 mm 2-legged at 75 mm c/c over 0.75d ≈ 340 mm from cut-off point.

A RC beam has an effective depth of 45 cm and breadth of 30 cm. It contains 5-20 mm dia mild steel bars, out of which 2-20 mm dia bars are curtailed at a section where shear force at service load is 100 kN. Design the shear reinforcement if the concrete is M20.

Given: b=300b=300 mm, d=450d=450 mm, 5-20 mm mild steel bars (Fe250), with 2 bars curtailed at a section where the service shear is 100 kN, M20. The factored shear is Vu=1.5×100=150.0V_u=1.5\times100=150.0 kN. Stirrups: 8 mm 2-legged mild steel (fy=250f_y=250 N/mm2^2, Asv=100.5A_{sv}=100.5 mm2^2).

Step 1: Nominal shear stress

τv=Vubd=150.0×103300×450=1.111 N/mm2<τc,max=2.8 N/mm2\tau_v=\frac{V_u}{bd}=\frac{150.0\times10^3}{300\times450}=1.111\ \text{N/mm}^2<\tau_{c,max}=2.8\ \text{N/mm}^2

Step 2: Concrete strength. After curtailment, 3-20 mm bars remain: Ast=942.5A_{st}=942.5 mm2^2.

pt=100×942.5300×450=0.698% ⇒ τc=0.543 N/mm2,Vc=τcbd=73.4 kNp_t=\frac{100\times942.5}{300\times450}=0.698\%\ \Rightarrow\ \tau_c=0.543\ \text{N/mm}^2,\quad V_c=\tau_cbd=73.4\ \text{kN}

Step 3: Stirrups for shear

Vus=Vu−Vc=150.0−73.4=76.6 kNV_{us}=V_u-V_c=150.0-73.4=76.6\ \text{kN} sv=0.87fyAsvdVus=0.87×250×100.5×45076.6×103=128 mms_v=\frac{0.87f_yA_{sv}d}{V_{us}}=\frac{0.87\times250\times100.5\times450}{76.6\times10^3}=128\ \text{mm}

Spacing limits: 0.87fyAsv0.4b=182\dfrac{0.87f_yA_{sv}}{0.4b}=182 mm, 0.75d=3370.75d=337 mm, 300 mm. Provide sv=125s_v=125 mm for shear.

Step 4: Extra provisions where bars are curtailed (IS 456 cl. 26.2.3.2). Flexural bars may be stopped in a tension zone only if (a) the shear at the cut-off point is not more than 23\tfrac23 of the shear capacity of the section (including the shear reinforcement provided), or (b) excess stirrup area is provided along each terminated bar over a distance 34d\tfrac34d from the cut-off point, such that

Asv,excess≥0.4 b svfy,sv≤d8βbA_{sv,excess}\ge\frac{0.4\,b\,s_v}{f_y},\qquad s_v\le\frac{d}{8\beta_b}

where βb=area of bars cut offtotal area of bars at the section=25=0.4\beta_b=\dfrac{\text{area of bars cut off}}{\text{total area of bars at the section}}=\dfrac{2}{5}=0.4, so sv≤4508×0.4=141s_v\le\dfrac{450}{8\times0.4}=141 mm.

Check of option (a): with stirrups at 125 mm, Vus=0.87×250×100.5×450125=78.7V_{us}=\dfrac{0.87\times250\times100.5\times450}{125}=78.7 kN, so 23(73.4+78.7)=101.4\tfrac23(73.4+78.7)=101.4 kN <Vu=150.0<V_u=150.0 kN. Option (a) is not satisfied, so excess stirrups (option b) are needed.

Option (b): the stirrups must carry the shear plus the excess:

Asvsv=Vus0.87fyd+0.4bfy=76.6×1030.87×250×450+0.4×300250=0.783+0.480=1.263 mm2/mm\frac{A_{sv}}{s_v}=\frac{V_{us}}{0.87f_yd}+\frac{0.4b}{f_y}=\frac{76.6\times10^3}{0.87\times250\times450}+\frac{0.4\times300}{250}=0.783+0.480=1.263\ \text{mm}^2/\text{mm} sv=100.51.263=80 mm (<141 mm, OK)s_v=\frac{100.5}{1.263}=80\ \text{mm}\ (<141\ \text{mm, OK})

Provide 8 mm 2-legged stirrups at 75 mm c/c in this zone.

Answer: 8 mm 2-legged mild steel stirrups at 125 mm c/c for shear near the cut-off section, reduced to 75 mm c/c over a length 34d≈340\tfrac34d\approx340 mm from the cut-off point along the curtailed bars.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Design of RCC Structure chapter 5 questions →