Seepage discharge through dam body (k = 1×10⁻⁶ m/s)

Short answer

Casagrande's parabola gives y0 = 3.71 m and phreatic line y = sqrt(13.77+7.42x). Seepage discharge q = k·y0 = 3.711×10⁻⁶ m³/s per m.

The following figure shows the cross-section of an earthen dam having coefficient of permeability 1×10−61 \times 10^{-6} m/s. Calculate the seepage discharge through the body of the dam with the help of the phreatic line. [Figure: earthen dam with crest width 8 m, 3 m dimension at the top (upstream free-board/water level mark), H = 30 m, downstream slope 2.5 : 1, drainage filter at the toe, horizontal dimensions 30 m and 170 m at the base.]

Reading of the figure (assumptions): water depth H=h=30H=h=30 m, free board 3 m so dam height =33=33 m; crest width 8 m; d/s slope 2.5:1; total base width B=170B=170 m; drainage filter at the toe, so the focus of the parabola is at the d/s toe; impervious foundation; k=1×10−6k=1\times10^{-6} m/s.

Step 1: Geometry

d/s projection=2.5×33=82.5 mu/s projection=170−8−82.5=79.5 m ⇒ u/s slope=2.41:1b=2.41×30=72.3 m (wetted part),0.3b=21.7 md=B−0.7b=170−50.6=119.4 m\begin{aligned} \text{d/s projection} &= 2.5\times33=82.5\ \text{m}\\ \text{u/s projection} &= 170-8-82.5=79.5\ \text{m}\ \Rightarrow\ \text{u/s slope}=2.41:1\\ b &= 2.41\times30=72.3\ \text{m (wetted part)},\quad 0.3b=21.7\ \text{m}\\ d &= B-0.7b = 170-50.6=119.4\ \text{m} \end{aligned}

Step 2: Phreatic line (Casagrande)

y0=h2+d2−d=302+119.42−119.4=3.71 my_0=\sqrt{h^2+d^2}-d=\sqrt{30^2+119.4^2}-119.4=3.71\ \text{m} y=y02+2y0x=13.77+7.42 xy=\sqrt{y_0^2+2y_0x}=\sqrt{13.77+7.42\,x}
x from focus (m)y (m)
0.03.71
10.09.38
25.014.12
50.019.62
75.023.88
100.027.49
119.430.00

The line is drawn from the corrected entry point (at x=dx=d, y=30y=30 m), made normal to the u/s face at the start, and ends at the drainage filter at the toe.

Step 3: Seepage discharge

Because dy/dx=y0ydy/dx=\dfrac{y_0}{y} and q=k y dydxq=k\,y\,\dfrac{dy}{dx} is constant along the line,

q=k y0=1×10−6×3.71=3.711×10−6 m3/s per mq=k\,y_0=1\times10^{-6}\times3.71=3.711 \times 10^{-6}\ \text{m}^3/\text{s per m}

Answer: q≈3.711×10−6q\approx3.711 \times 10^{-6} m³/s per metre length of dam (≈0.321\approx0.321 m³/day per m).