EIA; environmental problems in Nepal

Short answer

Environmental Impact Assessment is a systematic study to identify, predict, evaluate and mitigate project effects on the physical, biological, social and cultural environment before decision-making. In Nepal, major problems include deforestation, soil erosion, air and water pollution, solid waste, and climate change impacts. Improvement requires strict EIA enforcement, afforestation, slope stabilization, treatment plants, clean transport, waste management, and public awareness.

Define EIA. What are the environmental problems in Nepal and how do you improve them?

EIA

Environmental Impact Assessment (EIA) is a systematic study to identify, predict, evaluate and mitigate the positive and negative effects of a proposed project on the physical, biological, social and cultural environment before decisions are taken. In Nepal, it is required by the Environment Protection Act, 2019 and Environment Protection Rules, 2020: IEE for smaller projects and full EIA for larger ones (for example hydropower above 50 MW, roads in sensitive areas).

Steps

  1. Screening: decide whether IEE or EIA is needed.
  2. Scoping: identify key issues and prepare the terms of reference.
  3. Baseline study of existing environment.
  4. Impact identification and prediction (checklist, matrix, network, overlay).
  5. Evaluation of significance and comparison of alternatives.
  6. Mitigation measures and Environmental Management Plan.
  7. Report preparation, public hearing and review.
  8. Approval, monitoring and auditing.

Environmental problems in Nepal

  • Deforestation and loss of biodiversity.
  • Soil erosion, landslides and flood in the hills and Terai.
  • Air pollution in Kathmandu valley (vehicles, brick kilns, dust).
  • Water pollution of rivers (Bagmati) from sewage and industry.
  • Solid waste and poor disposal.
  • Glacier retreat and climate change effects.
  • Unplanned urbanisation and loss of farmland.
  • Noise pollution and haphazard resource extraction (sand, boulders).

Types of impacts

TypeMeaning
Direct / indirectImmediate result vs secondary effect
Positive / negativeBeneficial vs harmful
Short term / long termDuring construction vs during operation
Reversible / irreversibleCan recover or not
Local / regional / globalExtent of area affected
CumulativeAdded effect of many projects
Physical, biological, socio-economic, culturalComponent affected

Improvement measures

Strict EIA and monitoring, afforestation, slope stabilisation, treatment plants, clean transport and emission standards, waste management, community forestry, public awareness and law enforcement.