Short answer

Prime coat (cutback, 0.6-1.0 kg/m²) binds and waterproofs granular bases; tack coat (emulsion, 0.20-0.30 kg/m²) bonds between bituminous layers. Surface dressing construction: spray hot binder (1.0-1.5 kg/m²), cover with chips, roll, sweep loose chips, and cure; for double dressing apply a second coat with smaller chips.

Distinguish between prime coat and tack coat. Explain construction method of surface dressing.

Prime coat vs tack coat

BasisPrime coatTack coat
Applied onGranular (WBM/WMM) or untreated baseExisting bituminous or concrete surface, or between bituminous layers
PurposeBinds loose particles, plugs surface voids, gives bond to the layer above, waterproofs the baseProvides bond between old surface and new bituminous layer
BinderLow-viscosity cutback (MC-30/70) or slow-setting emulsionEmulsion (RS-1/SS-1) or rapid curing cutback
Rate0.6-1.0 kg/m20.20-0.30 kg/m2 (thin film)
PenetrationPenetrates 3-6 mm into baseRemains on the surface
CuringCures 24-48 hours before layingCures (breaks) in a short time before laying

Construction method of surface dressing

  1. Prepare the surface: repair potholes and cracks, sweep and clean; apply a tack or prime coat if needed. The weather should be dry (surface temperature above 20 C, no rain).
  2. Spray binder: heat paving bitumen (VG-10/30 or 80/100) to 150-170 C (cutback is heated to a lower temperature, as specified) and spray it uniformly with a pressure distributor at the specified rate (about 1.0-1.5 kg/m2).
  3. Spread chips: immediately cover the binder fully with clean, dry single-size chips (13.2 mm, or 11.2/9.5 mm for the second coat) by chip spreader or by hand, in a single layer without overlap.
  4. Roll: roll with an 8-10 t smooth-wheel or a pneumatic tyre roller from the edges to the centre until the chips are embedded (about 50-70 percent of their depth).
  5. Brush and cure: sweep off loose chips after traffic has bedded them in; restrict speed to 20-30 km/h for the first few days.
  6. For double surface dressing, the second coat of binder and smaller chips is applied in the same way after the first.