- Asked 3/16
- 2082 Baisakh · 6 marks
Schedule speed for a 2 km run (trapezoidal)
Short answer
Using trapezoidal curve with distance 2 km, K=1.5625, solving gives maximum speed 52.6 km/h and running time 178 s. Adding 26 s stop gives schedule speed ≈ 35.3 km/h.
An electric train is to have acceleration and retardation of 0.8 km/h/s and 3.2 km/h/s respectively. If the ratio of maximum to average speed is 1.3, find schedule speed for a run of 2 km. Time taken at stops = 26 seconds. Assume simplified trapezoidal speed-time curve.
Data: km/h/s, km/h/s, , km, stop s.
Trapezoidal relation
Average speed , so .
Times and speeds
Check: s, s, free run s.
Answer: Schedule speed = 35.3 km/h (maximum speed 52.6 km/h).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Schedule speed for a 1.5 km run (trapezoidal) · Utilization of Electrical Energy, chapter 4 · asked 3×
- Schedule speed for a 2.5 km run (trapezoidal) · Utilization of Electrical Energy, chapter 4 · asked 3×
- Acceleration, coasting retardation and schedule speed · Utilization of Electrical Energy, chapter 4
- Crest, average and schedule speed; speed-time curve · Utilization of Electrical Energy, chapter 4
- Durations of acceleration, coasting and braking (2 km run) · Utilization of Electrical Energy, chapter 4 · asked 2×
- Acceleration for 200 t train, stations 777 m apart · Utilization of Electrical Energy, chapter 4 · asked 2×
- Acceleration for 25 kmph schedule speed, 800 m stations · Utilization of Electrical Energy, chapter 4
- Crest speed for 60 kmph schedule over 6 km · Utilization of Electrical Energy, chapter 4