Skip to main content

Engineering evaluation of hazard

Short answer

Hazard evaluation is classified as absolute (quantitative probability or factor of safety) and relative (ranking). Absolute assessment uses deterministic factor-of-safety calculations or probabilistic analysis of historical event frequencies to compute annual probability and design magnitudes, producing numerical hazard maps.

Classify the engineering evaluation of hazard. How is absolute hazard assessment carried out?

Classification of engineering evaluation of hazard

Hazard can be evaluated in two ways.

  1. Absolute hazard evaluation: the hazard is given a numerical value of probability (for example, a 1 in 100 year event) or a quantity such as factor of safety, annual probability, expected displacement, magnitude. It is quantitative and used in design.
  2. Relative hazard evaluation: areas are ranked as high, moderate or low by comparison with each other, without absolute probability; qualitative or semi-quantitative (hazard zoning maps).

Absolute hazard assessment (how it is done)

  1. Collect data: past events (inventory), geology, slope, rainfall, earthquake records, geotechnical parameters.
  2. Deterministic method: compute the factor of safety of the slope, for example
F=cA+Wcos⁡βtan⁡ϕWsin⁡βF = \frac{cA + W\cos\beta\tan\phi}{W\sin\beta}

with F<1F<1 meaning failure. 3. Probabilistic method: use frequency of past events to calculate return period TT and annual probability P=1/TP = 1/T; probability of occurrence in nn years is 1−(1−1/T)n1-(1-1/T)^n. 4. Define the design event (design earthquake, 100-year flood) and compute magnitude, runout distance or displacement. 5. Present results as hazard maps with numerical values and use them in design and risk calculation.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Engineering Geology II chapter 5 questions →