- 2075 Baisakh · 4 marks
Selecting support type for underground opening
Short answer
Support selection is based on rock mass classification (RMR or Q) and opening span, using design charts and site conditions. Good rock is self-supporting with spot bolts, while poor rock needs immediate systematic bolting, thick shotcrete, and steel ribs to prevent loosening.
How do you select the support type for an underground opening? Describe with justification.
The support type for an underground opening is selected from the quality of the rock mass, the size of the opening and the expected loads, using classification systems and site conditions.
Steps of selection
- Investigate and classify: map the rock, estimate RQD, joint sets, strength and groundwater, and determine RMR and/or Q for each tunnel section.
- Find the span and use: the larger the span (or equivalent dimension ), the heavier the support. A permanent hydropower tunnel needs more safety than a temporary adit.
- Use the charts and tables: RMR class guidelines (bolts, shotcrete, ribs) or the Barton Q-chart.
- Check special conditions: high stress, squeezing or swelling ground, running water, fault zones, joint orientation relative to the axis.
Typical selection (RMR)
| Class | Support |
|---|---|
| I | None or spot bolts |
| II | Local bolts, 50 mm shotcrete |
| III | Systematic bolts, mesh, 50 to 100 mm shotcrete |
| IV | Bolts, 100 to 150 mm shotcrete, light steel ribs |
| V | Heavy steel ribs, thick shotcrete, forepoling, closed invert |
Justification
- Good rock carries itself, so only local support is economical.
- Poor and very poor rock loosens rapidly and needs immediate and stiff support (shotcrete and ribs) to prevent collapse.
- Bolts reinforce the rock so it supports itself, shotcrete seals the surface, and ribs carry the loose rock load.
- The final choice is checked and adjusted by observation and monitoring during construction.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Role of RMR in underground design · Engineering Geology II, chapter 6 · asked 2×
- Underground RCC tank: brickwork, steel (fig a) · Estimating and Costing, chapter 6
- Opening and closing a data file · Computer Programming, chapter 10 · asked 2×
- Selecting a processor or microcontroller · Instrumentation II, chapter 1 · asked 4×
- Sal select grade beam, 15 kN/m, 4 m · Design of Steel and Timber Structure, chapter 12