The flow chokes because the approach energy (2.204 m) is less than the required E_c + Δz (2.280 m). Upstream depth rises by 0.09 m to 2.09 m. At the contracted, raised section, critical depth 1.29 m occurs; the water surface drops 0.36 m below the original level.
A discharge of 16 m³/s flows with depth of 2 m in a 4 m wide rectangular channel. At a downstream section, the width is reduced to 3.5 m and the channel bed is raised by 0.35 m. To what extent will the surface elevation be affected by these changes?
Given: , , ; at the downstream section and the bed is raised by .
Upstream:
At the contracted, raised section (check for choking):
Minimum upstream energy needed .
Since , the approach flow has too little energy. The flow is choked: critical depth forms at the section and the upstream depth must rise.
New upstream depth:
Effect on the water surface:
| Location | Change |
|---|---|
| Upstream of the contraction | Surface rises by (backwater) |
| At the contracted, raised section | Depth ; surface is above the old bed level, i.e. 0.363 m below the original surface |
Answer: The surface is affected: it rises about 0.09 m upstream (to 2.09 m depth) and drops to critical depth 1.29 m over the raised, narrowed section.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Contraction and bed rise, 3.5 m channel (1 m depth) · Hydraulics, chapter 7 · asked 2×
- Contraction and bed rise, 3.5 m channel (1.2 m depth) · Hydraulics, chapter 7
- Water surface over hump with contraction · Hydraulics, chapter 7
- Direct step, 16 m wide channel, 40 m³/s · Hydraulics, chapter 8
- Hump and constriction: critical depth, 2 m channel · Hydraulics, chapter 7 · asked 2×
- Contraction with lowered bed, 10 m³/s · Hydraulics, chapter 7
- Efficient rectangular section and triangular channel depth · Hydro Power, chapter 1 · asked 2×
- Flood discharge in rectangular channel · Hydro Power, chapter 2
- Flood discharge in a 5-m rectangular channel · Engineering Hydrology, chapter 4
- Flood discharge in 10-m rectangular channel · Engineering Hydrology, chapter 4