- 2076 Baisakh · 8 marks
Backwater distance within 100 mm of normal depth
Short answer
The dam creates an M1 backwater curve, with normal depth 1.80 m and critical depth 0.678 m. Direct stepping from 2.5 m to 1.90 m gives the depth within 100 mm of normal depth about 8.15 km upstream of the dam.
A dam is built across a channel of rectangular cross section which carries water at the rates of 8.75 m³/s. As a result the depth just upstream of the dam is increased to 2.5 m. The channel is 5 m wide and the slope of the bed is 1 in 5000. The channel is lined with concrete (Manning's n = 0.015). How far upstream is the depth within 100 mm of the normal depth?
Given: , , , , depth at the dam m.
Depths
By Manning's equation (trial, ): .
Since on a mild slope, the profile is M1 (backwater). Going upstream, the depth falls towards . We need the distance upstream to the point where m.
Direct step method, 4 equal steps from 2.5 m to 1.90 m ( m):
| (m) | (m) | (m/s) | (m) | () | () | (m) |
|---|---|---|---|---|---|---|
| 2.500 | 1.250 | 0.700 | 2.5250 | 0.82 | ||
| 2.350 | 1.211 | 0.745 | 2.3784 | 0.97 | 0.89 | -1323 |
| 2.200 | 1.170 | 0.795 | 2.2325 | 1.15 | 1.06 | -1552 |
| 2.050 | 1.126 | 0.853 | 2.0875 | 1.40 | 1.28 | -2003 |
| 1.900 | 1.080 | 0.921 | 1.9438 | 1.72 | 1.56 | -3270 |
The negative sign means upstream. A finer integration gives about 8.26 km.
Answer: The depth is within 100 mm of the normal depth about 8.15 km (roughly 8.2 km) upstream of the dam (M1 backwater curve).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Distance to within 5% of normal depth · Hydraulics, chapter 8
- Backwater distance into reservoir, 6 m channel · Hydraulics, chapter 8
- Jump upstream of a low dam · Hydraulics, chapter 9
- Bed slope for critical normal depth · Hydraulics, chapter 7
- Normal depth in compound channel · Hydraulics, chapter 6
- Bresse's method for 20 m wide channel · Hydraulics, chapter 8
- Efficient rectangular section and triangular channel depth · Hydro Power, chapter 1 · asked 2×
- Cross wall design, 120 mm slab, 3 m wide · Concrete Technology and Masonry Structure, chapter 8 · asked 4×
- Normal depth in triangular channel (1:1) · Hydro Power, chapter 1 · asked 2×
- Efficient trapezoidal section and triangular channel depth · Hydro Power, chapter 1 · asked 2×