- 2070 Magh · 8 marks
Backwater distance into reservoir, 6 m channel
Short answer
The profile is M1 (backwater). Using the direct step method, the distance L from the 2 m depth upstream to the 3 m depth at the reservoir entry is approximately 202 m.
The clean earth (n = 0.020) channel in figure below is 6 m wide and laid on a slope of 0.005236. Water flows at 30 m³/s in the channel and enters a reservoir so that the channel depth is 3 m just before the entry. Assuming gradually varied flow, calculate the distance L. [Figure: channel with a 2 m depth marked at the upstream end of the reach and a 3 m depth at the reservoir entry; L is the length of the reach between them]
Given: m, , , . The depth is 3 m at the reservoir entry and 2 m at the upstream end of the reach. Find the length between them. (Assumed reading of the figure: the 2 m depth is upstream, at distance from the entry.)
Depths ():
, so the slope is (just) mild. Depths of 2 m to 3 m are above , so the profile is M1 (backwater from the reservoir). The depth falls going upstream.
Direct step method, 4 steps of 0.25 m, from m to m:
| (m) | (m) | (m/s) | (m) | (m) | ||
|---|---|---|---|---|---|---|
| 2.00 | 1.200 | 2.500 | 2.3186 | 0.00196 | ||
| 2.25 | 1.286 | 2.222 | 2.5017 | 0.00141 | 0.00169 | 51.6 |
| 2.50 | 1.364 | 2.000 | 2.7039 | 0.00106 | 0.00124 | 50.5 |
| 2.75 | 1.435 | 1.818 | 2.9185 | 0.00082 | 0.00094 | 49.9 |
| 3.00 | 1.500 | 1.667 | 3.1416 | 0.00065 | 0.00073 | 49.5 |
(Steps are taken from the upstream depth 2 m towards the reservoir, so is measured downstream.)
A finer integration gives 201.0 m, which agrees.
Answer: (M1 backwater profile).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Backwater distance within 100 mm of normal depth · Hydraulics, chapter 8
- Define gradually varied flow · Hydraulics, chapter 5 · asked 2×
- Slope break and distance to depth 0.4 m · Hydraulics, chapter 8
- Bresse's method for 20 m wide channel · Hydraulics, chapter 8
- Bed slope for critical normal depth · Hydraulics, chapter 7
- GVF in 5 m channel, depth 0.25 m to 0.40 m · Hydraulics, chapter 8 · asked 2×
- Projectile at 30°, 61 m/s to target below · Applied Mechanics, chapter 8 · asked 2×
- Maximum speed and distance before braking (2.5 km) · Utilization of Electrical Energy, chapter 4
- Reservoir intake for an earth dam · Water Supply Engineering, chapter 5 · asked 2×
- Hill road earthwork, 0+020 to 0+140 · Estimating and Costing, chapter 6 · asked 2×