Three successive slopes: profiles and length
Short answer
Profile sequence: M2 on reach 1, S2 followed by hydraulic jump and S1 on reach 2, M1 on reach 3. The M2 drawdown profile in slope 1 is about 950 m long measured from 0.98 y_n to critical depth.
For a rectangular channel shown in fig. below, with width = 7 m, the flow rate is 8 m³/sec, = 0.00032, = 0.011, = 0.0911, = 0.021, = 0.00020 where = bed slope and n = manning's coeff. i) Draw longitudinal water surface profiles for these three successive reaches. ii) Compute the length of profile in slope 1 only using direct step method or Bresse's method taking 3 steps only. [Figure: three successive reaches: slope 1 (, ), slope 2 (, ) and slope 3 (); a depth of 1.2 m is marked at the downstream end of slope 3]
Given: , (). Slope 1: , . Slope 2: , . Slope 3: , with m at its downstream end. is not given, so is assumed.
Critical and normal depths
| Reach | (m) | Class |
|---|---|---|
| 1 | 0.886 | mild () |
| 2 | 0.224 | steep () |
| 3 | 1.033 | mild |
i) Longitudinal profiles
- Reach 1 (mild): the flow upstream is uniform at 0.886 m. At the break to the steep slope the flow passes through critical depth, so the surface falls as an M2 curve from to at the end of the reach.
- Reach 2 (steep): the flow starts at and falls as an S2 curve to the uniform supercritical depth of m.
- Reach 3 (mild): the depth at the downstream end is , so an M1 backwater curve rises downstream from near m to 1.2 m.
- Jump: the sequent depth of the supercritical flow (0.224 m) is m, which is less than the depth at the head of reach 3 ( m). The tailwater is too deep for the jump to form on the mild reach, so it is pushed up onto the steep reach 2. After the jump an S1 curve rises from about 0.98 m to about 1.03 m at the break. Because is very steep, this S1 curve is short.
R1 (mild) | R2 (steep) | R3 (mild)
-- yn=0.886 | | 1.2 m
\__ M2 |\ S2 J S1 | M1 _____---
yc '-.. - - -| '-._ yn=0.224 /'''''|__---'
ii) Length of the M2 profile in reach 1
The M2 curve approaches only asymptotically, so it is taken from to m in 3 equal steps (the control is at the downstream end).
| (m) | (m) | (m/s) | (m) | (m) | ||
|---|---|---|---|---|---|---|
| 0.8680 | 0.695 | 1.317 | 0.9563 | 0.00034 | ||
| 0.7488 | 0.617 | 1.526 | 0.8676 | 0.00054 | 0.00044 | 748.6 |
| 0.6297 | 0.534 | 1.815 | 0.7976 | 0.00092 | 0.00073 | 171.2 |
| 0.5106 | 0.446 | 2.238 | 0.7659 | 0.00178 | 0.00135 | 30.7 |
Answer: Profile sequence: M2 (reach 1), S2, hydraulic jump and S1 (reach 2), M1 (reach 3). The M2 profile in slope 1 is about 950 m long (measured from to , in the flow direction).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Slope break: jump depth and jump length by step · Hydraulics, chapter 9
- Slope change 1/120 to 1/1500, jump and profile length · Hydraulics, chapter 8
- Bed slope for critical normal depth · Hydraulics, chapter 7
- Trapezoidal to rectangular transition with bed lowering · Hydraulics, chapter 7
- Sluice gate profiles and lengths by direct step · Hydraulics, chapter 8
- Bed, hydraulic and energy slopes · Hydraulics, chapter 5
- Economical rectangular condition and trapezoidal bed slope · Hydro Power, chapter 1
- Uniform flow in rectangular channel (Chezy) · Hydro Power, chapter 1
- Irrigation channel earthwork, bed 5 m, 1 in 3000 · Estimating and Costing, chapter 6
- Crest width, cistern length of vertical drop, Q 1.55 · Irrigation and Drainage Engineering, chapter 7 · asked 2×