Three reservoirs ZA 65, ZB 70, ZC 40

Short answer

With resistance factors computed from pipe lengths, diameters and f = 0.025, trial HJ is adjusted to satisfy continuity at junction D. At HJ = 40.69 m, the flows are: Q_AD = 0.44 L/s (A→D), Q_BD = 12.56 L/s (B→D), Q_DC = 12.99 L/s (D→C), all from higher to lower head.

In the reservoir system of figure ZAZ_A = 65 m, ZCZ_C = 40 m, ZBZ_B = 70 m, BD = 900 m of 10 cm diameter pipe, AD = 600 m of 2.5 cm diameter pipe and DC = 150 m of 15 cm diameter pipe. Using f = 0.025 and neglecting minor losses, determine the flow in each pipe. [Figure: reservoir A (65 m) and reservoir B (70 m) joined at junction D; pipe DC leads to outlet C at 40 m discharging to atmosphere; horizontal datum below]

Data. ZA=65Z_A = 65 m, ZB=70Z_B = 70 m, ZC=40Z_C = 40 m; AD: 600 m, 25 mm; BD: 900 m, 100 mm; DC: 150 m, 150 mm; f=0.025f = 0.025. Only friction, hf=rQ2h_f = rQ^2, r=8fLπ2gD5r = \dfrac{8fL}{\pi^2gD^5}.

PipeL (m)D (m)r (s²/m⁵)
AD6000.025126914853
BD9000.100185910
DC1500.1504080.3

Method

Let HDH_D be the piezometric head at D. Flows are directed from the higher to the lower head. C (40 m) is the lowest, so DC always carries water to C. B (70 m) is the highest, so B supplies. A (65 m) supplies if HD<65H_D < 65 m and receives water if HD>65H_D > 65 m.

Trial with HD=65H_D = 65 m (no flow in AD): QBD=5/185910=0.0052Q_{BD} = \sqrt{5/185910} = 0.0052 m³/s in, QDC=25/4080.3=0.0783Q_{DC} = \sqrt{25/4080.3} = 0.0783 m³/s out. The outflow is larger than the inflow, so HDH_D must be lowered below 65 m, and A also supplies D: QAD+QBD=QDCQ_{AD} + Q_{BD} = Q_{DC}.

HDH_D (m)QADQ_{AD}QBDQ_{BD}QDCQ_{DC}QAD+QBD−QDCQ_{AD} + Q_{BD} - Q_{DC}
640.000090.005680.07669-0.07092
500.000340.010370.04951-0.03879
450.000400.011600.03501-0.02301
40.690.000440.012560.01300-0.00001

The balance is at HD=40.69H_D = 40.69 m.

Discharges

QAD=65−40.69126914853=0.000438 m3/s=0.44 l/s(A to D)Q_{AD} = \sqrt{\frac{65 - 40.69}{126914853}} = 0.000438\ \text{m}^3/\text{s} = 0.44\ \text{l/s}\quad(\text{A to D}) QBD=70−40.69185910=0.01256 m3/s=12.56 l/s(B to D)Q_{BD} = \sqrt{\frac{70 - 40.69}{185910}} = 0.01256\ \text{m}^3/\text{s} = 12.56\ \text{l/s}\quad(\text{B to D}) QDC=40.69−404080.3=0.01299 m3/s=12.99 l/s(D to C)Q_{DC} = \sqrt{\frac{40.69 - 40}{4080.3}} = 0.01299\ \text{m}^3/\text{s} = 12.99\ \text{l/s}\quad(\text{D to C})

Check: 0.438+12.556=12.994≈12.990.438 + 12.556 = 12.994 \approx 12.99 l/s.

Answer: QAD=0.44Q_{AD} = 0.44 l/s (A to D), QBD=12.56Q_{BD} = 12.56 l/s (B to D), QDC=12.99Q_{DC} = 12.99 l/s (D to C); HD=40.69H_D = 40.69 m.