Skip to main content

Three reservoirs with two parallel pipes

Short answer

(i) Q₃/Q₄ = √(r₄/r₃) = 1.438, so Q₃ = 1.438 Q₄. (ii) Hydraulic grade line at junction D is 108.95 m. (iii) Pipe flows: Q₁=1.942, Q₂=0.073 (to B), Q₃=1.102, Q₄=0.766, Q₅=1.868 m³/s.

Three reservoirs are connected as shown below, with the connecting pipes having the following properties (length, diameter, friction factor and minor losses) as shown below:

PipeL (m)D (mm)fΣK\Sigma K
12805000.0213.5
29803000.0220.0
32705500.0170.0
47006500.0283.5
57807500.0301.5

The corresponding reservoir elevation are: ZAZ_A = 185 m, ZBZ_B = 105 m and ZCZ_C = 70 m. [Figure: reservoir A connected by pipe 1 to junction D; reservoir B connected to D by pipe 2; pipes 3 and 4 run in parallel from D, then pipe 5 leads to reservoir C]. Calculate: (i) The relationship between the flow rates in the two parallel pipes that form part of the system. (ii) The value of the Hydraulic Grade Line (HGL) at junction D, and (iii) The flow rates in all five pipes for this value.

Layout assumed from the figure. A feeds junction D by pipe 1; B joins D by pipe 2; from D two pipes, 3 and 4, run in parallel to a junction E; pipe 5 then runs from E to reservoir C. Minor losses are included through ∑K\sum K: for each pipe the head loss is h=(fLD+∑K)V22g=rQ2h = \left(\dfrac{fL}{D} + \sum K\right)\dfrac{V^2}{2g} = rQ^2, with

r=8π2gD4(fLD+∑K)r = \frac{8}{\pi^2gD^4}\left(\frac{fL}{D} + \sum K\right)
PipefL/DfL/D∑K\sum Kr (s²/m⁵)
111.763.520.174
271.870733.10
38.34507.536
430.153.515.578
531.201.58.539

(i) Relation between the flows in the two parallel pipes

They have the same head loss, so r3Q32=r4Q42r_3Q_3^2 = r_4Q_4^2:

Q3Q4=r4r3=15.5787.536=1.438  ⇒  Q3=1.438 Q4\frac{Q_3}{Q_4} = \sqrt{\frac{r_4}{r_3}} = \sqrt{\frac{15.578}{7.536}} = 1.438 \;\Rightarrow\; Q_3 = 1.438\,Q_4

The equivalent resistance of the pair is given by 1rpar=1r3+1r4\dfrac{1}{\sqrt{r_{par}}} = \dfrac{1}{\sqrt{r_3}} + \dfrac{1}{\sqrt{r_4}}, so rpar=2.621r_{par} = 2.621 s²/m⁵, and Q5=Q3+Q4Q_5 = Q_3 + Q_4.

(ii) HGL at junction D

Let HDH_D be the HGL at D. Pipe 5 is in series with the parallel pair (3, 4), so HD−ZC=(rpar+r5)Q52H_D - Z_C = (r_{par} + r_5)Q_5^2.

  • Pipe 1: Q1=(185−HD)/r1Q_1 = \sqrt{(185 - H_D)/r_1} (A to D)
  • Pipe 2: Q2=∣105−HD∣/r2Q_2 = \sqrt{|105 - H_D|/r_2}, towards B if HD>105H_D > 105, from B if HD<105H_D < 105
  • Pipe 5: Q5=(HD−70)/(rpar+r5)Q_5 = \sqrt{(H_D - 70)/(r_{par} + r_5)}
  • Continuity at D: Q1=Q2+Q5Q_1 = Q_2 + Q_5 (when B is receiving), or Q1+Q2=Q5Q_1 + Q_2 = Q_5 (when B is supplying).

Trials (Q2>0Q_2 > 0 means B supplies D, Q2<0Q_2 < 0 means B receives):

HDH_D (m)Q1Q_1Q2Q_2Q5Q_5Q1+Q2−Q5Q_1 + Q_2 - Q_5
1002.053+0.0831.640+0.496
1051.991+0.0001.771+0.220
1081.954-0.0641.845+0.044
1101.928-0.0831.893-0.048

The sum changes sign between 108 and 110 m, and the balance is at

HD=108.95 mH_D = 108.95\ \text{m}

Since HD>105H_D > 105 m, pipe 2 carries water to reservoir B.

(iii) Flow rates

PipeQ (m³/s)Direction
11.942A to D
20.073D to B
31.102D to E
40.766D to E
51.868E to C

Pipe 5: Q5=(108.95−70)/(2.621+8.539)=1.868Q_5 = \sqrt{(108.95 - 70)/(2.621 + 8.539)} = 1.868 m³/s. The HGL at junction E is 70+r5Q52=99.8070 + r_5Q_5^2 = 99.80 m, so Q3=(108.95−99.80)/7.536=1.102Q_3 = \sqrt{(108.95 - 99.80)/7.536} = 1.102 and Q4=(108.95−99.80)/15.578=0.766Q_4 = \sqrt{(108.95 - 99.80)/15.578} = 0.766 m³/s.

Continuity check at D: Q1=1.942=Q2+Q5=0.073+1.868Q_1 = 1.942 = Q_2 + Q_5 = 0.073 + 1.868.

Answer: (i) Q3=1.438 Q4Q_3 = 1.438\,Q_4; (ii) HGL at D ≈109.0\approx 109.0 m; (iii) Q1=1.942Q_1 = 1.942, Q2=0.073Q_2 = 0.073 (to B), Q3=1.102Q_3 = 1.102, Q4=0.766Q_4 = 0.766, Q5=1.868Q_5 = 1.868 m³/s.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Hydraulics chapter 3 questions →