Skip to main content

Three reservoirs with 250 mm concrete pipes

Short answer

Solve Colebrook-White for f and iterate H_J for continuity: Q_2 = 450.4 L/s (in), Q_3 = 47.9 L/s (in), Q_1 = 498.3 L/s (out); piezometric head at junction ≈ 68.5 m.

For the three reservoir system of figure below Z1Z_1 = 29 m, L1L_1 = 80 m, Z2Z_2 = 129 m, L2L_2 = 150 m, Z3Z_3 = 69 m and L3L_3 = 110 m. All pipes are 250 mm diameter concrete with roughness height 0.5 mm. Compute the flow rates. Take ν=1.02×10−6\nu = 1.02\times10^{-6} m²/s. You are not allowed to use the Moody's chart. [Figure: three reservoirs with water levels Z1Z_1, Z2Z_2, Z3Z_3 connected by pipes of lengths L1L_1, L2L_2, L3L_3 to a common junction a]

Data. Z1=29Z_1 = 29 m, Z2=129Z_2 = 129 m, Z3=69Z_3 = 69 m; L1=80L_1 = 80 m, L2=150L_2 = 150 m, L3=110L_3 = 110 m; D=0.25D = 0.25 m, k=0.5k = 0.5 mm, ν=1.02×10−6\nu = 1.02\times10^{-6} m²/s. The friction factor is found from the Colebrook-White equation (no Moody chart), neglecting minor losses and velocity heads at the reservoirs.

kD=0.5250=0.0020,1f=−2log⁡10(k/D3.7+2.51Ref)\frac{k}{D} = \frac{0.5}{250} = 0.0020,\qquad \frac{1}{\sqrt f} = -2\log_{10}\left(\frac{k/D}{3.7} + \frac{2.51}{Re\sqrt f}\right)

A starting value comes from the fully rough formula 1f=2log⁡10Dk+1.14\dfrac{1}{\sqrt f} = 2\log_{10}\dfrac{D}{k} + 1.14, giving f0=0.0234f_0 = 0.0234.

Method

Let HJH_J be the piezometric head at the junction. For pipe ii the head loss is ∣Zi−HJ∣=fiLiDVi22g|Z_i - H_J| = f_i\dfrac{L_i}{D}\dfrac{V_i^2}{2g}, so Vi=2gD∣Zi−HJ∣fiLiV_i = \sqrt{\dfrac{2gD|Z_i - H_J|}{f_iL_i}}, with fif_i updated from Rei=ViD/νRe_i = V_iD/\nu. The correct HJH_J satisfies continuity at the junction: ∑Q=0\sum Q = 0.

Reservoir 2 is the highest (129 m) and reservoir 1 the lowest (29 m), so the junction head lies between 29 and 129 m. If HJ>69H_J > 69 m, reservoir 3 receives water; if HJ<69H_J < 69 m, it also feeds the junction. Trying values (each with Colebrook for ff):

  • HJ=69H_J = 69 m: Q1≈0.50Q_1 \approx 0.50 m³/s out, Q2≈0.45Q_2 \approx 0.45 m³/s in, Q3=0Q_3 = 0. Outflow > inflow, so HJH_J must be lowered below 69 m, and reservoir 3 then supplies the junction.
  • Further trials just below 69 m give the balance at HJ≈68.48H_J \approx 68.48 m.

Final solution (HJ=68.48H_J = 68.48 m)

PipeZ (m)L (m)Z−HJZ - H_J (m)fV (m/s)ReQ (l/s)
12980-39.480.0235010.1512.488e+06-498.3
2129150+60.520.023509.1762.249e+06+450.4
369110+0.520.024170.9752.390e+05+47.9

(Positive QQ = into the junction; negative = out of the junction.) Check: 450.4+47.9=498.3450.4 + 47.9 = 498.3 l/s in, and 498.3498.3 l/s out.

Answer: Reservoir 2 delivers Q2=450.4Q_2 = 450.4 l/s and reservoir 3 delivers Q3=47.9Q_3 = 47.9 l/s to the junction; both flow on to reservoir 1 with Q1=498.3Q_1 = 498.3 l/s. Junction piezometric head HJ=68.48H_J = 68.48 m (about 68.5 m).

✓ Answer checked by Claude Opus 5.5 (high effort)

All Hydraulics chapter 3 questions →