Skip to main content

Valve openings for equal discharge to B and C

Short answer

From p_D = 39.24 kN/m², H_D = 104 m; pipe resistances give Q_AD = 59.55 L/s and Q_B = Q_C = 29.77 L/s. Available head balances valve resistances: n₁ ≈ 77.3%, n₂ ≈ 81.7%.

Determine the percentage opening n1n_1 and n2n_2 of valve V1V_1 and V2V_2 of the three reservoir system as shown in figure below to supply equal amount of discharge in reservoirs B and C from A. [Figure: reservoir A at 110 m; reservoir B at 95 m; reservoir C at 90 m; junction D at 100 m with PDP_D = 39.24 kN/m²; pipe AD to the junction, pipe BD with valve V1V_1 and pipe CD with valve V2V_2]

PipeL (m)D (m)f
AD10000.250.02
BD8000.200.02
CD12000.200.02
ValvePercentage openingResistance (r)
V1V_1 (BD)n1n_1(6000/n1)2(6000/n_1)^2
V2V_2 (CD)n2n_2(8000/n2)2(8000/n_2)^2

Data. A = 110 m, B = 95 m, C = 90 m; junction D at elevation 100 m with pD=39.24p_D = 39.24 kN/m². Friction only, hf=rQ2h_f = rQ^2, r=8fLπ2gD5r = \dfrac{8fL}{\pi^2gD^5} for the pipes and the valve resistances given.

Piezometric head at D

HD=zD+pDγ=100+39.249.81=100+4.00=104.00 mH_D = z_D + \frac{p_D}{\gamma} = 100 + \frac{39.24}{9.81} = 100 + 4.00 = 104.00\ \text{m}

Since HD=104H_D = 104 m is below A (110 m) and above B (95 m) and C (90 m), pipe AD supplies D, and D supplies both B and C.

Pipe resistances (s²/m⁵)

PipeL (m)D (m)r
AD10000.251692.2
BD8000.204131.3
CD12000.206197.0

Discharges

QAD=110−1041692.2=0.05955 m3/s=59.55 l/sQ_{AD} = \sqrt{\frac{110 - 104}{1692.2}} = 0.05955\ \text{m}^3/\text{s} = 59.55\ \text{l/s}

Equal discharge to B and C: QB=QC=QAD2=0.02977Q_B = Q_C = \dfrac{Q_{AD}}{2} = 0.02977 m³/s (29.7729.77 l/s).

Valve V1V_1 in pipe DB

Head available from D to B: 104−95=9104 - 95 = 9 m =(rBD+rV1)QB2= (r_{BD} + r_{V1})Q_B^2:

rV1=90.029772−4131.3=6021.8=(6000n1)2  ⇒  n1=60006021.8=77.3 %r_{V1} = \frac{9}{0.02977^2} - 4131.3 = 6021.8 = \left(\frac{6000}{n_1}\right)^2 \;\Rightarrow\; n_1 = \frac{6000}{\sqrt{6021.8}} = 77.3\ \%

Valve V2V_2 in pipe DC

Head available from D to C: 104−90=14104 - 90 = 14 m =(rCD+rV2)QC2= (r_{CD} + r_{V2})Q_C^2:

rV2=140.029772−6197.0=9596.8=(8000n2)2  ⇒  n2=80009596.8=81.7 %r_{V2} = \frac{14}{0.02977^2} - 6197.0 = 9596.8 = \left(\frac{8000}{n_2}\right)^2 \;\Rightarrow\; n_2 = \frac{8000}{\sqrt{9596.8}} = 81.7\ \%

Answer: n1≈77.3 %n_1 \approx 77.3\ \% and n2≈81.7 %n_2 \approx 81.7\ \% (each with Q=29.8Q = 29.8 l/s to B and to C).

✓ Answer checked by Claude Opus 5.5 (high effort)