- 2065 Kartik (old course) · 10 marks
Composite curve R=400 m, Ls=90 m, IP 1+400
Short answer
Beginning chainage TS = 1209.10 m, end ST = 1578.36 m. Tangential angles on transition: 0°06′57″ (at 1230 m) and 0°41′14″ (at 1260 m). Deflection angles on circular curve: 0°03′51″ and cumulative 1°29′47″ for first two points.
Two straights AB and BC intersect at the chainage (1+400) kilometer, the deflection angle being 40°00'. It is proposed to layout a circular curve of 400 m radius with a cubic parabola of 90 m length at each end. Peg intervals for circular and transition curve are 20 m and 30 m respectively. Calculate tangential angles for first two points on transition curve, deflection angles for two points on the circular curve and chainage at the beginning and at the end of this composite curve.
Given: , m, m, chainage of IP km m, peg interval 30 m on the transitions and 20 m on the circular curve.
Curve elements
Chainages
- Beginning of composite curve, TS m
- SC m
- CS m
- End of composite curve, ST m
Tangential angles on the transition (from TS)
minutes. First two points (the first sub-chord runs to the next 30 m peg):
| Point (chainage, m) | l (m) | α (min) | α |
|---|---|---|---|
| 1230.00 | 20.90 | 6.95′ | 0°06′57″ |
| 1260.00 | 50.90 | 41.23′ | 0°41′14″ |
The full transition table is:
| Point (chainage, m) | l from TS (m) | α (min) | α (° ′ ″) |
|---|---|---|---|
| 1209.10 | 0.00 | 0.00′ | 0°00′00″ |
| 1230.00 | 20.90 | 6.95′ | 0°06′57″ |
| 1260.00 | 50.90 | 41.23′ | 0°41′14″ |
| 1290.00 | 80.90 | 104.16′ | 1°44′10″ |
| 1299.10 | 90.00 | 128.93′ | 2°08′56″ |
Deflection angles on the circular curve (from SC)
minutes; first two points:
| Point (chainage, m) | Chord c (m) | δ | Cumulative |
|---|---|---|---|
| 1300.00 | 0.90 | 0°03′51″ | 0°03′51″ |
| 1320.00 | 20.00 | 1°25′57″ | 1°29′47″ |
Full table:
| Point (chainage, m) | Chord c (m) | δ = 1718.87c/R | Cumulative deflection |
|---|---|---|---|
| 1299.10 | - | - | 0°00′00″ |
| 1300.00 | 0.90 | 0°03′51″ | 0°03′51″ |
| 1320.00 | 20.00 | 1°25′57″ | 1°29′47″ |
| 1340.00 | 20.00 | 1°25′57″ | 2°55′44″ |
| 1360.00 | 20.00 | 1°25′57″ | 4°21′41″ |
| 1380.00 | 20.00 | 1°25′57″ | 5°47′37″ |
| 1400.00 | 20.00 | 1°25′57″ | 7°13′34″ |
| 1420.00 | 20.00 | 1°25′57″ | 8°39′30″ |
| 1440.00 | 20.00 | 1°25′57″ | 10°05′27″ |
| 1460.00 | 20.00 | 1°25′57″ | 11°31′24″ |
| 1480.00 | 20.00 | 1°25′57″ | 12°57′20″ |
| 1488.36 | 8.36 | 0°35′55″ | 13°33′15″ |
Check: last cumulative angle = 13°33′15″.
Answer: TS = 1209.10 m and ST = 1578.36 m (beginning and end of the composite curve); deflection angles as tabulated.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Transition curve 6°, Ls=90 m, chainage 13+700 · Surveying II, chapter 6
- Transition curve 6°, Ls=90 m, chainage (13+7) chains · Surveying II, chapter 6
- Transition curve R=300 m, deflection 40° · Surveying II, chapter 6
- Circular curve with cubic spiral transitions R=450 · Surveying II, chapter 6
- Composite curve by deflection angle method · Surveying II, chapter 6 · asked 5×
- Composite curve design, IP 1150 m, Rankine · Surveying II, chapter 6 · asked 2×
- Transition curve 400 m radius, 85 kmph · Transportation Engineering I, chapter 3 · asked 2×
- Composite curve with 48 degree deflection · Transportation Engineering I, chapter 3
- Transition curve 625 m radius, 90 kmph · Transportation Engineering I, chapter 3
- Transition curve for 310 m radius · Transportation Engineering I, chapter 3