- 2073 Magh · 6 marks
Omitted measurement cases, traverse plotting
Short answer
Omitted measurements in a closed traverse are solved using ΣLat=0, ΣDep=0. Cases: missing length or bearing of one line, length and bearing of one line, lengths of two lines (sine rule), bearings of two lines (cosine rule), or one length and one bearing (SSA). Plotting by coordinates: compute station coordinates, draw grid, plot stations by (E,N), and join; errors don't accumulate.
Explain different cases of omitted measurements in theodolite traversing. Explain plotting of traverse in grid sheet by co-ordinates method.
Cases of omitted measurement
The sum of latitudes and the sum of departures of a closed traverse are both zero. These two equations allow two unknowns (lengths or bearings) to be found. The known lines are combined into a single resultant with latitude and departure ; the closing line is equal and opposite to it, with length and bearing given by , with the quadrant taken from the signs.
| Case | Unknown quantities | Method |
|---|---|---|
| 1 | Length or bearing of one line | Direct from , |
| 2 | Length and bearing of one line | Closing line gives both directly |
| 3 | Lengths of two lines | Sine rule in the closing triangle |
| 4 | Bearings of two lines | Cosine rule in the closing triangle |
| 5 | Length of one line and bearing of another | Solve the closing triangle (SSA, two solutions possible) |
The affected lines may be adjacent or non-adjacent. If they are not adjacent, the known lines between them are shifted (a closed traverse still closes if the order of its lines is changed), which brings the unknown lines together so that the same triangle method applies.
Plotting by the coordinates method (outline)
- Compute the independent coordinates of all stations (from the adjusted latitudes and departures).
- Choose a scale, draw a grid sheet and label the grid lines with northings and eastings.
- Mark each station at its position measured from the grid lines, join the stations in order and check that the plotted lengths agree with the field lengths.
- Plot details from the stations and complete the map with the title, scale and north arrow.
Plotting by coordinates is preferred to protractor plotting because errors do not accumulate.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Field measurements in traversing, closed/open traverse · Surveying II, chapter 1
- Plotting coordinated traverse on grid paper · Surveying II, chapter 1 · asked 2×
- Closed loop/link traverse, grid plotting · Surveying II, chapter 1
- Field measurements in traversing, Bowditch rule · Surveying II, chapter 1
- Principles and planning of theodolite traverse · Surveying II, chapter 1
- Omitted measurement, non-adjacent affected sides · Surveying II, chapter 1 · asked 4×
- Plotting theodolite traverse; repetition errors · Surveying I, chapter 7
- Closing error; plotting methods in compass traverse · Surveying I, chapter 4
- Theodolite traverse ABCDA with missing VCR (68°30′10″) · Surveying I, chapter 7
- Theodolite traverse ABCDA, booking format with VCR · Surveying I, chapter 7