- 2066 Bhadra (old course) · 5 marks
British method of mix design
Short answer
DoE method: target mean strength fm = fck + 1.64 s. Determine w/c from strength charts and durability limits. Free water content from tables by slump, max size, aggregate type (uncrushed/crushed). Cement content = water / w/c. Total aggregate = wet density – cement – water. Fine aggregate proportion from grading zone and slump charts. Adjust with trial mix and moisture corrections.
Describe the step by step process of mix design of concrete by using the British method.
The British (DoE) method (BRE/DoE 1988, "Design of Normal Concrete Mixes") selects the mix from charts and tables; it is a wet-density method.
Steps
- Target mean strength: , with (5% defectives) and = standard deviation (about 4-8 MPa, from site data).
- w/c ratio: from Table 2, find the strength at w/c 0.5 for the cement type, aggregate type (crushed/uncrushed) and age; draw the curve through this point on Fig 1 and read the w/c for the target strength; check the maximum w/c from durability requirements and use the lower value.
- Free-water content: from Table 3, for the slump (0-10, 10-30, 30-60, 60-180 mm) or Vebe time, the maximum size (10, 20, 40 mm) and the aggregate type. When the fine and coarse aggregates are of different types: , where and are the water contents for the type of fine and coarse aggregate respectively.
- Cement content = free water / (w/c); check the minimum and maximum limits.
- Total aggregate content: from Fig 3, find the wet density of concrete for the free-water content and the aggregate SG; total aggregate = wet density - cement - water.
- Fine aggregate proportion: from Fig 4, using the grading zone (% passing 600 micron), size, slump and w/c.
- Fine and coarse aggregate masses: FA = proportion total aggregate; CA = remainder; the coarse aggregate may be split into sizes.
- Trial mix: adjust for slump and strength; correct for the moisture content at site.
f_ck+ks -> w/c -> + water -> cement
|
density chart -> total agg -> FA / CA
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- ACI mix design for M35 concrete (numerical) · Concrete Technology and Masonry Structure, chapter 3 · asked 2×
- ACI mix design for M25 concrete (numerical) · Concrete Technology and Masonry Structure, chapter 3 · asked 2×
- Fundamental concepts of concrete mix design · Concrete Technology and Masonry Structure, chapter 3
- ACI mix design for 25 MPa concrete (numerical) · Concrete Technology and Masonry Structure, chapter 3
- DOE mix design for M25 concrete (numerical) · Concrete Technology and Masonry Structure, chapter 3
- ACI method of mix design steps · Concrete Technology and Masonry Structure, chapter 3 · asked 9×
- Site engineer uses weaker mortar and concrete mix · Engineering Professional Practice, chapter 7
- Step by step project appraisal process · Project Engineering, chapter 2
- Marshall method of bituminous mix design · Transportation Engineering I, chapter 6 · asked 9×
- Steps in the design and synthesis process · Machine Design I, chapter 1
All Concrete Technology and Masonry Structure chapter 3 questions →