- 2073 Shrawan · 1+2+3 marks
Continuous vs discrete variables, return period formulae
Short answer
Continuous random variables (e.g. annual peak discharge, rainfall depth) take any value in an interval; discrete variables (e.g. number of rainy days) take distinct countable values. Return period plotting-position formulas include Weibull T=(N+1)/m, California T=N/m, and Hazen T=2N/(2m-1).
Differentiate between continuous and discrete random variables. Give examples each in hydrology. Give three formulae which are used to determine the return period.
Continuous and discrete random variables
| Basis | Continuous random variable | Discrete random variable |
|---|---|---|
| Values | Can take any value in an interval (infinite possible values) | Takes only distinct, countable values (0, 1, 2, ...) |
| Obtained by | Measuring | Counting |
| Probability described by | Probability density function ; probability is area under the curve | Probability mass function ; probability at each value |
| Probability at a single value | Zero | Non-zero |
| Cumulative function | Integral of the PDF | Sum of the PMF |
| Examples in hydrology | Annual peak discharge (m³/s), rainfall depth (mm), evaporation, river stage | Number of rainy days in a month, number of floods exceeding a level in 50 years, number of years with drought |
Formulae for return period
With N years of record and m the rank of the event (largest = 1), the plotting position formulae are:
- Weibull: (most commonly used)
- California:
- Hazen: (i.e. )
Other forms are Gringorten, , and Blom. In terms of probability, , where is the exceedance probability.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Flood of return period T using log-normal distribution · Engineering Hydrology, chapter 6
- Gumbel return period and confidence limit · Engineering Hydrology, chapter 6 · asked 2×
- Return period of 350 m3/s design flood by Gumbel · Engineering Hydrology, chapter 6 · asked 2×
- Gumbel flood for 500-year return period · Engineering Hydrology, chapter 6
- 24-hr maximum rainfall for 50-year return period · Engineering Hydrology, chapter 6
- Define return period, frequency and risk · Engineering Hydrology, chapter 6
- Discrete and continuous random variables · Probability and Statistics, chapter 2
- Discrete vs continuous signal; convert (25.25)₁₀ · Digital Logic, chapter 1
- Discrete vs continuous attributes · Data Mining, chapter 2
- Continuous-time vs discrete-time signals · Signals and Systems, chapter 1 · asked 3×