- 2068 Chaitra · 9 marks
Gumbel design flood for highway bridge, 4% risk
Short answer
Design return period from 4% risk in 50 years: T=1225 years. Using Gumbel linearity in reduced variate with known floods (150 m³/s at 50 yr, 650 m³/s at 300 yr), design flood ≈ 1041 m³/s.
A highway bridge has to be designed with an expected life of 50 years and an allowable flood risk of 4%. The flood data of bridge site were well fitted to Gumbel EV distribution and discharges for 50 and 300 years return period are found to be 150 and 650 m/sec respectively. Estimate the frequency and magnitude of design flood for the bridge.
Frequency (return period) of the design flood
Risk in a life years:
The design flood is the 1225-year flood, with annual exceedance probability .
Magnitude of the design flood
Gumbel's equation is linear in the reduced variate , so the two known floods define the line:
| T (yr) | (m³/s) | |
|---|---|---|
| 50 | 3.9019 | 150 |
| 300 | 5.7021 | 650 |
| 1225 | 7.1106 | ? |
Answer: design return period ≈ 1225 years; design flood ≈ 1041 m³/s.
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Gumbel flood at given risk, 50-year project life · Engineering Hydrology, chapter 6
- Gumbel design flood, 21 years data, 40-year life · Engineering Hydrology, chapter 6 · asked 3×
- Return period of 350 m3/s design flood by Gumbel · Engineering Hydrology, chapter 6 · asked 2×
- Return period for bridge design at 5% risk · Engineering Hydrology, chapter 6
- Gumbel design flood, 43 years data, 85% reliability · Engineering Hydrology, chapter 6 · asked 2×
- Prove mean annual flood has 2.33-year return period · Engineering Hydrology, chapter 6