Rational and empirical flood equations

Short answer

Rational: Qp = 0.278 C i A (A in km²). Empirical: Dickens Q = CD A^(3/4), Ryves Q = CR A^(2/3), Inglis Q = 124A/√(A+10.4), Fuller Q = Cf A^0.8(1+0.8 log T), WECS for Nepal. Rational limited to small catchments (<50 km²), gives only peak; empirical methods are regional, ignore rainfall intensity and catchment characteristics.

Write the equations of flood prediction by rational and empirical methods. Also write the limitations and appropriate uses of these equations.

Rational method

Qp=C i A360(A in ha, i in mm/h, Q in m3/s)orQp=0.278 C i A (A in km2)Q_p = \frac{C\,i\,A}{360}\quad(\text{A in ha, i in mm/h, Q in m}^3/\text{s})\qquad\text{or}\qquad Q_p=0.278\,C\,i\,A\ (A\text{ in km}^2)

i = intensity for duration tct_c and return period T; C = runoff coefficient.

  • Limitations: only small catchments (up to about 50 km²); uniform rainfall and constant C assumed; gives only the peak; ignores storage and antecedent moisture; needs IDF curves.
  • Appropriate use: design of urban drainage, culverts, small bridges, storm sewers and spillways of small catchments.

Empirical methods

Based on regional observations, the flood is a function of catchment area (and sometimes return period):

  1. Dickens (north India): Q=CD A3/4Q = C_D\,A^{3/4} (A in km²; CDC_D = 11 – 14 for the plains of north India, 14 – 28 for the hilly regions of north India, and 22 – 28 for central India).
  2. Ryves (south India): Q=CR A2/3Q = C_R\,A^{2/3} (CRC_R = 6.8 – 10.1 depending on distance from the coast).
  3. Inglis (Maharashtra, ghat areas): Q=124AA+10.4Q = \dfrac{124A}{\sqrt{A+10.4}}
  4. Fuller (USA): QT=Cf A0.8(1+0.8log⁡T)Q_T = C_f\,A^{0.8}(1+0.8\log T)
  5. Nepal (WECS/DHM method): Q2=1.8767 (A<3000+1)0.8783Q_2 = 1.8767\,(A_{<3000}+1)^{0.8783} and Q100=14.63 (A<3000+1)0.7342Q_{100}=14.63\,(A_{<3000}+1)^{0.7342}, where A<3000A_{<3000} is the catchment area below 3000 m elevation (km²), used for rivers without records.
  • Limitations: valid only for the region and range of area where the constants were derived; they ignore rainfall intensity, slope, shape and land use of the particular catchment; the constants are subjective; the return period is not known (except Fuller and WECS).
  • Appropriate use: quick, approximate estimates for preliminary design or for checking other methods, mainly in ungauged basins; not for final design of major structures.

Final design of large projects should use flood-frequency analysis (Gumbel, log-Pearson) or the unit hydrograph method with the observed data.

✓ Answer checked by Claude Sonnet 5.5