- 2076 Asoj · 5 marks
Multiple regression: yield on rainfall, fertilizer
Short answer
Least squares plane: yield = 1.706 + 0.738·rainfall + 0.082·fertilizer. For 13 mm rainfall and 9 kg fertilizer, estimated yield is 12.03 thousand tonnes.
Fit the regression line of yield of crop ('000 tones) on amount of rainfall (mm) and amount of fertilizers used (kg). Also estimate the yield of crop for the year in which rainfall is 13 mm and fertilizer used is 9 kg.
| Yield | 4 | 6 | 7 | 9 | 13 | 15 |
|---|---|---|---|---|---|---|
| Rainfall | 3 | 4 | 6 | 8 | 12 | 15 |
| Fertilizer | 4 | 10 | 14 | 20 | 24 | 30 |
Let y = yield, x₁ = rainfall, x₂ = fertilizer. Fit the plane y = a + b₁x₁ + b₂x₂ by least squares; n = 6.
Normal equations
Σy = na + b₁Σx₁ + b₂Σx₂ Σx₁y = aΣx₁ + b₁Σx₁² + b₂Σx₁x₂ Σx₂y = aΣx₂ + b₁Σx₁x₂ + b₂Σx₂²
Calculation of sums
y x1 x2 x1y x2y x1² x2² x1x2
4 3 4 12 16 9 16 12
6 4 10 24 60 16 100 40
7 6 14 42 98 36 196 84
9 8 20 72 180 64 400 160
13 12 24 156 312 144 576 288
15 15 30 225 450 225 900 450
--------------------------------------------------------
54 48 102 531 1116 494 2188 1034
Substituting:
54 = 6a + 48b₁ + 102b₂
531 = 48a + 494b₁ + 1034b₂
1116 = 102a + 1034b₁ + 2188b₂
Solving the three equations simultaneously (elimination or Cramer's rule):
a = 1.7061, b₁ = 0.7376, b₂ = 0.0820
Fitted regression: y = 1.706 + 0.738x₁ + 0.082x₂
Estimate for x₁ = 13 mm, x₂ = 9 kg
y = 1.7061 + 0.7376(13) + 0.0820(9) = 12.03 thousand tonnes.
Answer: y = 1.706 + 0.738x₁ + 0.082x₂; estimated yield ≈ 12.03 thousand tonnes (about 12032 tonnes).
✓ Answer checked by Claude Sonnet 5.5
Related questions
- Regression of rice yield on tillers · Probability and Statistics, chapter 5
- Twists regression; predict at 20% · Probability and Statistics, chapter 5 · asked 3×
- Regression: chemical yield vs temperature · Probability and Statistics, chapter 5
- Fit straight line: humidity and moisture · Probability and Statistics, chapter 5
- Twists regression; CI for slope · Probability and Statistics, chapter 5 · asked 3×
- Regression: operator experience and performance · Probability and Statistics, chapter 5
- 24-hr maximum rainfall for 50-year return period · Engineering Hydrology, chapter 6
- K-map Σm(7,9,12,13,14,15)+d, NOR-only · Digital Logic, chapter 3
- Minterms/maxterms; K-map Σm(0,1,2,4,6,8,9,12,13,14) · Digital Logic, chapter 3
- K-map Σ(1,2,3,8,9,10,11,13,14)+d, POS · Digital Logic, chapter 3