- 2069 Chaitra · 8 marks
Intake site factors; spring intake
Short answer
Selection depends on adequate dry-season yield, clean water upstream of pollution, a stable outer-bend reach with sufficient depth, flood safety, good foundation, no navigation obstruction, nearness to treatment, accessibility, and future expansion. A spring intake is a chamber at the spring eye with gravel filter, outlet, overflow, washout, vent, diversion drain, and fence.
What are the factors that should be considered during selection of an intake site? With neat sketches, describe the construction of a spring intake.
Factors for selecting an intake site
- Water quantity: the source must give the design flow even in the driest season; the minimum flow must exceed the demand.
- Water quality: the site should be upstream of towns, sewage and industrial discharges, and away from tributaries that bring silt or pollution.
- Stable bank and bed: choose a stable, non-eroding reach, preferably on the concave (outer) side of a bend where the water is deep and the current scours silt away.
- Depth of water: enough depth at all stages so the intake port stays submerged at low water.
- Flood level: the structure must stand above the highest flood level (HFL) or be safe against it, and the site should be free from flood and drift damage.
- Foundation: sound strata for the foundation of the intake tower and pipes.
- Navigation: the site must not obstruct navigation and should not be in a navigation channel.
- Distance and elevation: close to the treatment plant and consumers (shorter pipeline, lower cost); for gravity schemes, enough head.
- Accessibility: access for construction, inspection and maintenance in all seasons, and nearness to power for pumping.
- Future expansion and ownership of land/legal rights at the site.
- Ice and silt: the site should not be affected by ice formation or heavy sedimentation.
Construction of a spring intake
A spring intake (spring box or spring capture) is a small chamber built at the spring eye to collect all the flow from the spring, protect it from pollution, and send it to the pipeline by gravity. It is the most common intake for rural hilly areas of Nepal because springs give clean water at a high level.
Parts of a spring intake
- Collection chamber (spring box) of stone masonry or concrete, with a pre-cast cover and manhole.
- Gravel filter / perforated pipes at the back wall to collect water uniformly from the spring eye.
- Outlet pipe with a gate valve (and a strainer) to the pipeline.
- Overflow pipe to take excess water; washout (drain) pipe with a valve for cleaning; vent pipe with a screen.
- Protection works: clay/impervious cap over the spring, a diversion drain (catch drain) uphill to divert surface water, a fence, and a vegetation or plantation cover.
Plan
Diversion drain (uphill)
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
| fence |
| +---------------------+ |
| | gravel filter :::: | |
| | (spring eye) |-->| overflow
| | collection chamber | |
| | [manhole] outlet |==>| pipe to tank
| +----------+----------+ |
| washout pipe |
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Section / elevation
Vent Manhole cover
| ____|_____
ground | | | clay cap (0.5 m)
=======+--+ +=============
| | air |
Spring->|::| water lvl|--> overflow
gravel |::|~~~~~~~~~~|
filter |::| |==> outlet+valve
|__|__________|
washout pipe
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Reservoir intake and site selection factors · Water Supply Engineering, chapter 5 · asked 2×
- Factors in constructing a spring intake · Water Supply Engineering, chapter 5
- General river intake and site selection · Water Supply Engineering, chapter 5 · asked 3×
- Intake, its functions and site factors · Water Supply Engineering, chapter 5
- Intake components and site factors · Water Supply Engineering, chapter 5
- Spring intake with neat sketch · Water Supply Engineering, chapter 5 · asked 8×
- Bridge site factors and components with sketches · Transportation Engineering II, chapter 5
- Hydropower site selection factors · Power Plant Design, chapter 3
- Intake site selection for RoR plant · Hydro Power, chapter 5
- Distribution substation site selection factors · Industrial Power Distribution and Illumination, chapter 4