Stream gauging with calibration equation

Short answer

Use mid-section method: for each vertical, compute N=revolutions/duration, V=0.55N+0.04, segment width = (x_{i+1} - x_{i-1})/2, then ΔQ = w y V. Sum all ΔQ to get total discharge.

The following are the data obtained in a stream-gauging operation. A current meter with a calibration equation V = (0.55N+0.04) m/s, where N = revolutions per second was used to measure the velocity at 0.6 depth. Calculate the discharge in the stream. (The data table is not printed in the paper.)

The data table was not printed in the paper, so the full method is shown; the student puts in the given values.

Principle

Discharge is found by the velocity–area method: the cross-section is divided into vertical segments, the velocity in each is measured by a current meter, and

Q=∑ΔQi=∑wi yi VˉiQ = \sum \Delta Q_i = \sum w_i\,y_i\,\bar{V}_i

Steps

  1. Revolutions per second at each vertical: Ni=revolutionstime (s)N_i = \dfrac{\text{revolutions}}{\text{time (s)}}.
  2. Velocity at 0.6 depth from the calibration equation:
Vi=0.55Ni+0.04 m/sV_i = 0.55N_i + 0.04\ \text{m/s}

The velocity at 0.6y below the surface is taken as the mean velocity of that vertical. 3. Width of each segment (mid-section method):

wi=xi+1−xi−12w_i = \frac{x_{i+1} - x_{i-1}}{2}

where xx is the distance of the vertical from the bank. 4. Segment discharge: ΔQi=wi yi Vi\Delta Q_i = w_i\,y_i\,V_i. 5. Total discharge: Q=∑ΔQiQ = \sum \Delta Q_i. The edge verticals (depth 0) give zero flow.

Table layout

x (m)wiw_i (m)yiy_i (m)N (rev/s)ViV_i (m/s)wiyiw_iy_i (m²)ΔQi\Delta Q_i (m³/s)
.....................

Illustration

For a vertical at 4 m (neighbours at 1 m and 7 m) with depth 2.5 m and 60 revolutions in 100 s: N=0.6N = 0.6 rev/s, V=0.55×0.6+0.04=0.37V = 0.55 \times 0.6 + 0.04 = 0.37 m/s, w=(7−1)/2=3w = (7 - 1)/2 = 3 m, ΔQ=3×2.5×0.37=2.775\Delta Q = 3 \times 2.5 \times 0.37 = 2.775 m³/s.

Repeating for every vertical and adding gives the stream discharge. (For the similar question with verticals at 1, 4, 7 and 10 m from the left edge, this method gives Q ≈ 10.99 m³/s.)

✓ Answer checked by Claude Opus 5.5 (high effort)