- 2070 Bhadra · 8 marks
Room 40 × 15 m, 75 lux FTL design
Short answer
By lumen method, required luminaires N = 75×600/(2160×0.8×0.7)=37.2, rounded to 40 single 36 W FTL, arranged 10×4. Spacing 4 m×3.75 m within 6 m limit, actual illuminance 80.6 lux.
An illumination on the working plane of 75 lux is required in a room 40m × 15m in size. The luminaries are required to be hung 4m above the work bench. Assuming a suitable space height ratio, a utilization factor of 0.8, a lamp efficiency of 60 lumen per watt and maintenance factor is 0.7. Estimate the number and disposition of lamp and switches. Design the sub-circuits, distribution board if supply system is 3 phase 4 wire system and consider 1 × 36 watt FTL with electronic ballast.
Given: room 40 m × 15 m, E = 75 lux, Hm = 4 m, UF = 0.8, MF = 0.7, 1 × 36 W FTL with electronic ballast at 60 lm/W, 3-phase 4-wire supply. Assumptions: suitable space–height ratio 1.5 → maximum spacing 1.5 × 4 = 6 m; pf 0.9 with electronic ballast, ballast loss neglected.
Number of luminaires
Lumen method: N = (E × A) / (φ × UF × MF), where φ is the output of one luminaire.
Area A = 40 × 15 = 600 m²
φ per luminaire = 36 W × 60 lm/W = 2160 lm
Total lumens = E × A / (UF × MF)
= 75 × 600 / (0.8 × 0.7)
= 80357 lm
N = 80357 / 2160 = 37.2
Rounding up and fitting a regular grid: 10 × 4 = 40 luminaires (10 along the 40 m side, 4 along the 15 m side).
Arrangement and spacing
Spacing along length = 40/10 = 4 m
Spacing along width = 15/4 = 3.75 m
End spacing (to wall) = half of these
Max spacing = SHR × Hm = 1.5 × 4 = 6 m
4 m and 3.75 m ≤ 6 m → OK
Actual E = 40 × 2160 × 0.8 × 0.7 / 600
= 80.6 lux (≥ 75 lux required)
Layout diagram
Plan 40 m × 15 m (letter = phase of lamp circuit)
+---------------------+
| R R R R R R R Y Y Y |
| B B B B B B Y Y Y Y |
| B R R R R R R R Y Y |
| B B B B B B Y Y Y Y |
+---------------------+
[DB] [SB] <- entrance: DB and switch board
S S S S ... one switch per sub-circuit
Each light sub-circuit is controlled by one 6 A one-way switch; all switches are grouped on a switch board (SB) next to the entrance, and the DB is mounted beside it.
Sub-circuits
Rule (IS 732 / NEA practice): a light sub-circuit carries at most 10 points and 800 W. Here one luminaire is 36 W, so up to 10 luminaires per sub-circuit. Number of circuits is made a multiple of 3 for phase balance.
| Circuit | Luminaires | Load (W) | Current (A) | Phase | MCB |
|---|---|---|---|---|---|
| L1 | 7 | 252 | 1.22 | R | 6 A |
| L2 | 7 | 252 | 1.22 | Y | 6 A |
| L3 | 7 | 252 | 1.22 | B | 6 A |
| L4 | 7 | 252 | 1.22 | R | 6 A |
| L5 | 6 | 216 | 1.04 | Y | 6 A |
| L6 | 6 | 216 | 1.04 | B | 6 A |
Distribution board design
| Phase | Circuits | Load (W) | Current (A) |
|---|---|---|---|
| R | L1, L4 | 504 | 2.43 |
| Y | L2, L5 | 468 | 2.26 |
| B | L3, L6 | 468 | 2.26 |
Total connected load = 1440 W (lighting)
Most loaded phase = 504 W
Iph = 504 / (230 × 0.9) = 2.43 A
Main MCB ≥ 1.25 × 2.43 = 3.04 A → 6 A TPN MCB
DB specification: 4-way-per-phase TPN DB (12 ways in all, spares included) with 6 A TPN MCB as incomer, 25 A 4-pole RCCB (100 mA) for earth-leakage protection, 6 A SP MCBs (B-curve) for light circuits. Incoming cable: 4-core 1.5 mm² Cu PVC (rating 21 A ≥ 6 A), plus earth continuity conductor.
3-phase, 400/230 V, 4-wire supply
|
[Energy meter]
|
[6 A TPN MCB]
|
[25 A 4P RCCB]
|
==R====Y====B====N== busbars
| | | | |
L1 L2 L3 L4 L5 ...
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Drawing hall 40 × 25 × 6 m, 250 lux LED · Industrial Power Distribution and Illumination, chapter 7 · asked 3×
- Process room 40 × 20 m twin 40 W fluorescent · Industrial Power Distribution and Illumination, chapter 7 · asked 2×
- Process room 30 × 15 × 5 m fluorescent lighting · Industrial Power Distribution and Illumination, chapter 7
- Drawing hall 40 × 20 × 6 m lighting design · Industrial Power Distribution and Illumination, chapter 7 · asked 2×
- Department store 30 × 15 m twin 40 W fluorescent · Industrial Power Distribution and Illumination, chapter 7 · asked 3×
- Drawing hall 40 × 25 × 6 m, 90 lm/m² LED · Industrial Power Distribution and Illumination, chapter 7 · asked 2×
- Siphon with 75 mm pipes and summit height · Hydraulics, chapter 2
- Required SNR for 40 Mbps over 6 MHz · Data Communication, chapter 1
- Temperature for 30% occupation 0.75 eV above · Electrical Engineering Material, chapter 1
- Diesel cycle with compression ratio 15:1 · Power Plant Equipment, chapter 5
All Industrial Power Distribution and Illumination chapter 7 questions →