- 2066 Bhadra (old course) · 4 marks
Longitudinal section of a head regulator
Short answer
A head regulator longitudinal section shows a raised crest with gates, upstream cut-off and floor, downstream stilling basin with energy dissipation, downstream cut-off, and protection works of inverted filter and stone apron. These elements lengthen seepage, reduce uplift, and prevent scour.
Draw a neat longitudinal section through a head regulator of an irrigation head works showing all components.
A canal head regulator is built at the off-take of a canal from the headworks pond (u/s of the weir). A longitudinal section along the axis of the canal shows the following components.
Pond level ~~~~~~~~| gate |~~~~~~~ FSL canal ~~~~~~
| hoist |
___| bridge|___
crest level ___/ piers + gates \_____
|u/s | u/s | crest | d/s floor | d/s
|cut-off| floor | (raised) | (stilling)| protection
| d1 | | | | inv. filter
| | | | | + apron
|_______|_________|____________|___________|___ canal bed
<----- impervious floor ----->
Components
- Upstream cut-off (pile) and upstream floor: lengthen the seepage path and reduce the uplift and exit gradient.
- Crest wall: raised about 1.2 m above the under-sluice crest or river bed to exclude bed load.
- Gates and piers (vertical lift gates) with a bridge and hoist.
- Downstream floor (stilling basin): dissipates energy and withstands uplift.
- Downstream cut-off: keeps the exit gradient safe and protects the floor against scour.
- Protection works: inverted filter, loose stone apron, and wing walls splayed into the canal.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Headworks sketch, regulator section, protection works · Irrigation and Drainage Engineering, chapter 7
- Functions of head and cross regulator · Irrigation and Drainage Engineering, chapter 7 · asked 6×
- RT works, methods and guide bank components · Irrigation and Drainage Engineering, chapter 6
- Head regulator; outlets and escapes · Irrigation and Drainage Engineering, chapter 7 · asked 2×
- Functions of head regulator, cross regulator, escape · Irrigation and Drainage Engineering, chapter 7
- Stepwise design of head regulator · Irrigation and Drainage Engineering, chapter 7
- Level book and longitudinal section, RL 525.50 · Surveying I, chapter 5
- Moisture movement through building components · Building Technology, chapter 1 · asked 7×
- Components of a medium head high discharge plant · Power Plant Design, chapter 3 · asked 2×
All Irrigation and Drainage Engineering chapter 7 questions →