- 2078 Chaitra · 6 marks
Concrete-lined canal: Q 350
Short answer
Most economical section exceeds velocity limit. With V fixed at 2 m/s, required depth 3.11 m, bed width 51.6 m, side slope 1.5H:1V, bed slope 1 in 5000.
Design a concrete-lined canal to carry a discharge of 350 m³/s at a slope of 1 in 5000. The side slopes of the canal may be taken as 1.5:1. The value of n for lining is 0.014. Assume limiting velocity in the canal is 2 m/s.
Given: , (1 in 5000), , side slope 1.5H:1V, limiting velocity 2 m/s.
Most economical (best hydraulic) section
For a trapezoidal section of least perimeter: and .
Using Manning's equation with :
Velocity check
m/s is more than the limiting velocity 2 m/s, so the best section cannot be used. Fix m/s and find the section from the given slope.
From and :
Answer: m, m, side slope 1.5H:1V, in 5000, m/s (the best section would give velocity above the limit).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Concrete-lined canal: Q 45, 45° slopes · Irrigation and Drainage Engineering, chapter 4
- Concrete-lined canal: Q 70, slope 1 in 4000 · Irrigation and Drainage Engineering, chapter 4
- Kennedy design: Q 40, slope 1 in 5000 · Irrigation and Drainage Engineering, chapter 4
- Economical lined channel: Q 20 · Irrigation and Drainage Engineering, chapter 4
- Lined canal capacity and irrigable area · Irrigation and Drainage Engineering, chapter 4 · asked 2×
- Aqueduct: canal 35, drainage 350 · Irrigation and Drainage Engineering, chapter 8
- Economical channel: unlined versus concrete lined · Hydraulics, chapter 6 · asked 2×
- Efficient trapezoid with unequal side slopes · Hydraulics, chapter 6
- Maximising discharge with same lining · Hydro Power, chapter 1
- Rectangle with same lining for maximum discharge · Hydraulics, chapter 6
All Irrigation and Drainage Engineering chapter 4 questions →