- 2063 Baisakh (old course) · 12 marks
Aqueduct: canal 35, drainage 350
Short answer
Drainage waterway: 12 spans of 8 m, clear 96 m (Lacey's P=88.9 m). Canal flumed to 12 m wide trough, depth 1.5 m; velocity 1.944 m/s, friction loss 0.073 m. Total head loss including transitions is 0.189 m, so downstream canal bed is lowered by 0.189 m.
Design an aqueduct for the following data. Draw a neat sketch of designed aqueduct showing all dimensions and parameters. Canal: Q = 35 m³/s; FSL = 200.00; CBL = 198.5; B = 22 m; side slope 1.5:1. Drainage: Q = 350 m³/s; HFL = 196.5; DBL = 193.5; GL = 199.0; f (Lacey's) = 1. Assume flumed width of canal = 12 m and depth in transition = canal depth.
The canal ( = 35 m³/s) crosses a drainage of = 350 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Flumed width of canal 12 m and depth in trough = canal depth 1.5 m (as given); Lacey's = 1; trough = 0.015; slab 0.6 m.
1. Type of structure
Canal bed level (198.50 m) is higher than HFL of the drainage (196.50 m) by 2.00 m, enough for free board and slab depth. The canal can be carried in a trough over the drain with free flow beneath, so an aqueduct is suitable.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 12 spans of 8 m with piers 1.2 m thick: clear waterway = 12 × 8 = 96 m (> 88.9 m). Overall length = 96 + 11 × 1.2 = 109.2 m.
Check: mean velocity = Q/(L·d) = 350/(96 × 3.00) = 1.22 m/s. Lacey's regime depth = 3.31 m (with = 1); foundations of piers and abutments are taken about 1.5R = 5.0 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (22 + 1.5 × 1.5) × 1.5 = 36.38 m², = 35/36.38 = 0.962 m/s, = 0.0472 m. Top width = 26.50 m.
To save cost, the canal is flumed to a rectangular trough of width = 12 m, with the same full supply depth 1.5 m (the trough is as long as the drainage waterway, 109.2 m).
- Trough area = 12 × 1.5 = 18.00 m²; = 35/18.00 = 1.944 m/s (acceptable, < 2.5 m/s); = 0.1927 m
- Froude number = 0.51 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 18.00/15.00 = 1.200 m; friction slope = 0.000667 (Manning's n = 0.015); friction loss in trough = 0.000667 × 109.2 = 0.073 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 26.50 − 12 = 14.5 m
- Outlet length = 3 × (T − B_t)/2 = 21.8 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 200.000 m, so = 199.811 m, = 199.738 m, = 199.811 m. Trough bed = water level − 1.5 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 198.500 | 200.000 |
| 2 | End of inlet transition = start of trough | 198.311 | 199.811 |
| 3 | End of trough = start of outlet transition | 198.238 | 199.738 |
| 4 | End of outlet transition = normal canal | 198.311 | 199.811 |
Total loss of head = 200.000 − 199.811 = 0.189 m, so the canal bed downstream of the work is 0.189 m lower than upstream.
Check: soffit of trough slab (0.6 m thick) = 197.64 m; HFL + free board 0.6 m = 197.10 m. Clearance adequate.
Sketch of designed aqueduct
Longitudinal section along canal
FSL 200.00 ~~~~\ /~~~~ 199.81
bed 198.50 ----\_ trough bed 198.31 _/----
inlet | 12 spans x 8 m, piers 1.2 m | outlet
(wing walls) (wing walls)
HFL 196.50 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
bed 193.50 -------------------------------
Plan: 22 m -> 12 m (2:1 inlet) ... trough 109.2 m ... 12 m -> 22 m (3:1)
Answer: drainage waterway 96 m clear (12 × 8 m, overall 109.2 m); canal flumed to 12 m wide trough; bed/FSL at the four sections = 198.50/200.00, 198.31/199.81, 198.24/199.74, 198.31/199.81 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Siphon: canal 50, FSL 201.80, RCC flumed · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 20, drainage 200 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage (flumed): canal 30, drainage 200 · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 20, FSL 251.5 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: canal 300, drainage 500 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 50, bed 35 m, FSD 1.6 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- 10 kVA 200/400 V LV-side parameters · Electrical Machine, chapter 2
- 10 kVA 200/400 V tests, parameters on LV side · Electrical Machines, chapter 2
- Design: 200 m head plant, bus MVA levels · Power Plant Design, chapter 4 · asked 14×
- Cutting volume, 60 m, GL 1181.50, formation 1179.00 · Surveying I, chapter 9 · asked 8×
All Irrigation and Drainage Engineering chapter 8 questions →