Cross drainage: canal 300, drainage 500

Short answer

Siphon aqueduct chosen since drainage HFL (207.7 m) is 5.2 m above canal bed (202.5 m). Drainage waterway: 11 spans of 10 m (clear 110 m). Canal flumed to 26 m wide trough, depth 6.5 m. Inlet transition 10.5 m (2:1), outlet 15.8 m (3:1). Trough bed levels: start 202.419 m, end 202.391 m. Total head loss 0.064 m.

Design a suitable cross drainage structure for the following data. Canal Data: Discharge = 300 m³/s; Bed width = 30 m; FSL = 209 m; Bed level = 202.50 m; Side slope = ½:1 (H:V); Rugosity Coefficient (N) = 0.016. Drainage data: Discharge = 500 m³/s; Bed level = 198 m; HFL = 207.70 m; Silt factor (f) = 1.0.

The canal (QQ = 300 m³/s) crosses a drainage of QQ = 500 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.

Assumptions: Canal depth = FSL − bed = 209 − 202.5 = 6.5 m; side slope ½H:1V; ground level taken equal to canal bed; Lacey's ff = 1 and nn = 0.016 (as given) used for the trough; slab 0.6 m.

1. Type of structure

HFL of the drainage (207.70 m) is above the canal bed (202.50 m) by 5.20 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 207.70 − 198.00 = 9.70 m.

2. Drainage waterway

Lacey's regime perimeter (for a natural stream):

P=4.75Q=4.75500=106.2 mP = 4.75\sqrt{Q} = 4.75\sqrt{500} = 106.2\ \text{m}

Provide 11 spans of 10 m with piers 1.5 m thick: clear waterway = 11 × 10 = 110 m (> 106.2 m). Overall length = 110 + 10 × 1.5 = 125.0 m.

Check: velocity through the barrels (clear height 3.80 m, see section 4) = 500/(110 × 3.80) = 1.20 m/s, which is acceptable. Lacey's regime depth R=0.47(Q/f)1/3R = 0.47(Q/f)^{1/3} = 3.73 m (with ff = 1), so the scour level 1.5R = 5.6 m below HFL is at RL 202.1 m, which is above the drainage bed (198.00 m). Scour does not govern, so the foundations of piers and abutments are taken to a nominal depth of about 2 m below the drainage bed (about RL 196.0 m), with cut-offs and aprons.

3. Canal waterway (flumed rectangular trough)

Normal canal: area A1=(B+zD)DA_1=(B+zD)D = (30 + 0.5 × 6.5) × 6.5 = 216.12 m², V1V_1 = 300/216.12 = 1.388 m/s, hv1=V12/2gh_{v1}=V_1^2/2g = 0.0982 m. Top width T=B+2zDT=B+2zD = 36.50 m.

To save cost, the canal is flumed to a rectangular trough of width BtB_t = 26 m, with the same full supply depth 6.5 m (the trough is as long as the drainage waterway, 125.0 m).

  • Trough area = 26 × 6.5 = 169.00 m²; VtV_t = 300/169.00 = 1.775 m/s (acceptable, < 2.5 m/s); hvth_{vt} = 0.1606 m
  • Froude number = 0.22 < 1, flow is subcritical, so there is no hydraulic jump.
  • Hydraulic radius R=A/PR=A/P = 169.00/39.00 = 4.333 m; friction slope S=(nV/R2/3)2S=(nV/R^{2/3})^2 = 0.000114 (Manning's n = 0.016); friction loss in trough hf=S Lh_f=S\,L = 0.000114 × 125.0 = 0.014 m

4. Transitions and levels

  FSL ---.                            .--- FSL
         '--.______________________.--'
  bed ---.                            .--- bed
         '--.______________________.--'
  normal  inlet     flumed trough     outlet  normal
  canal   (2:1)                      (3:1)   canal

Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:

  • Inlet length = 2 × (T − B_t)/2 = 36.50 − 26 = 10.5 m
  • Outlet length = 3 × (T − B_t)/2 = 15.8 m

Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):

W2=W1+hv1−hvt−0.3(hvt−hv1)W3=W2−hfW4=W3+hvt−hv1−0.5(hvt−hv1)\begin{aligned} W_2 &= W_1 + h_{v1} - h_{vt} - 0.3(h_{vt}-h_{v1}) \\ W_3 &= W_2 - h_f \\ W_4 &= W_3 + h_{vt} - h_{v1} - 0.5(h_{vt}-h_{v1}) \end{aligned}

W1W_1 = 209.000 m, so W2W_2 = 208.919 m, W3W_3 = 208.905 m, W4W_4 = 208.936 m. Trough bed = water level − 6.5 m.

SectionLocationBed level (m)FSL (m)
1Normal canal, start of inlet transition202.500209.000
2End of inlet transition = start of trough202.419208.919
3End of trough = start of outlet transition202.405208.905
4End of outlet transition = normal canal202.436208.936

Total loss of head = 209.000 − 208.936 = 0.064 m, so the canal bed downstream of the work is 0.064 m lower than upstream.

Check: with trough slab 0.6 m thick, soffit of the barrels = 201.80 m, i.e. 3.80 m above the drainage bed; HFL stands 5.90 m above the soffit, which gives the siphonic head.

Answer: drainage waterway 110 m clear (11 × 10 m, overall 125.0 m); canal flumed to 26 m wide trough; bed/FSL at the four sections = 202.50/209.00, 202.42/208.92, 202.40/208.90, 202.44/208.94 m.