- 2076 Baisakh · 12 marks
Cross drainage: canal 300, drainage 500
Short answer
Siphon aqueduct chosen since drainage HFL (207.7 m) is 5.2 m above canal bed (202.5 m). Drainage waterway: 11 spans of 10 m (clear 110 m). Canal flumed to 26 m wide trough, depth 6.5 m. Inlet transition 10.5 m (2:1), outlet 15.8 m (3:1). Trough bed levels: start 202.419 m, end 202.391 m. Total head loss 0.064 m.
Design a suitable cross drainage structure for the following data. Canal Data: Discharge = 300 m³/s; Bed width = 30 m; FSL = 209 m; Bed level = 202.50 m; Side slope = ½:1 (H:V); Rugosity Coefficient (N) = 0.016. Drainage data: Discharge = 500 m³/s; Bed level = 198 m; HFL = 207.70 m; Silt factor (f) = 1.0.
The canal ( = 300 m³/s) crosses a drainage of = 500 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Canal depth = FSL − bed = 209 − 202.5 = 6.5 m; side slope ½H:1V; ground level taken equal to canal bed; Lacey's = 1 and = 0.016 (as given) used for the trough; slab 0.6 m.
1. Type of structure
HFL of the drainage (207.70 m) is above the canal bed (202.50 m) by 5.20 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 207.70 − 198.00 = 9.70 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 11 spans of 10 m with piers 1.5 m thick: clear waterway = 11 × 10 = 110 m (> 106.2 m). Overall length = 110 + 10 × 1.5 = 125.0 m.
Check: velocity through the barrels (clear height 3.80 m, see section 4) = 500/(110 × 3.80) = 1.20 m/s, which is acceptable. Lacey's regime depth = 3.73 m (with = 1), so the scour level 1.5R = 5.6 m below HFL is at RL 202.1 m, which is above the drainage bed (198.00 m). Scour does not govern, so the foundations of piers and abutments are taken to a nominal depth of about 2 m below the drainage bed (about RL 196.0 m), with cut-offs and aprons.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (30 + 0.5 × 6.5) × 6.5 = 216.12 m², = 300/216.12 = 1.388 m/s, = 0.0982 m. Top width = 36.50 m.
To save cost, the canal is flumed to a rectangular trough of width = 26 m, with the same full supply depth 6.5 m (the trough is as long as the drainage waterway, 125.0 m).
- Trough area = 26 × 6.5 = 169.00 m²; = 300/169.00 = 1.775 m/s (acceptable, < 2.5 m/s); = 0.1606 m
- Froude number = 0.22 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 169.00/39.00 = 4.333 m; friction slope = 0.000114 (Manning's n = 0.016); friction loss in trough = 0.000114 × 125.0 = 0.014 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 36.50 − 26 = 10.5 m
- Outlet length = 3 × (T − B_t)/2 = 15.8 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 209.000 m, so = 208.919 m, = 208.905 m, = 208.936 m. Trough bed = water level − 6.5 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 202.500 | 209.000 |
| 2 | End of inlet transition = start of trough | 202.419 | 208.919 |
| 3 | End of trough = start of outlet transition | 202.405 | 208.905 |
| 4 | End of outlet transition = normal canal | 202.436 | 208.936 |
Total loss of head = 209.000 − 208.936 = 0.064 m, so the canal bed downstream of the work is 0.064 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 201.80 m, i.e. 3.80 m above the drainage bed; HFL stands 5.90 m above the soffit, which gives the siphonic head.
Answer: drainage waterway 110 m clear (11 × 10 m, overall 125.0 m); canal flumed to 26 m wide trough; bed/FSL at the four sections = 202.50/209.00, 202.42/208.92, 202.40/208.90, 202.44/208.94 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cross drainage (flumed): canal 30, drainage 200 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 30, HFL 311 m · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 50, bed 35 m, FSD 1.6 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: canal 125, drainage 64 · Irrigation and Drainage Engineering, chapter 8
- Siphon design: canal 18, drainage 60 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 50, HFD 550 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Phreatic line and discharge (crest 300 masl) · Hydropower Engineering, chapter 4 · asked 2×
All Irrigation and Drainage Engineering chapter 8 questions →