Cross drainage: Q 30, HFL 311 m

Short answer

A siphon aqueduct with 12 spans of 10 m (120 m clear waterway) passes 550 m³/s drainage. Canal flumed to 8 m wide rectangular trough (2.1 m depth) over 136.5 m. Four section levels (downstream bed fixed at 310.000 m): 1) Bed 310.186, FSL 312.286; 2) Bed 309.987, FSL 312.087; 3) Bed 309.923, FSL 312.023; 4) Bed 310.000, FSL 312.100. Total head loss 0.186 m.

A canal carrying 30 m³/sec of discharge with a bed width of 30 m and bed level at downstream is 310.0 m is crossing the natural drainage having bed level 308.0 m and the high flood level of 311.0 m which carries the 50 year return period flood as 550 cumecs. The full supply depth of canal is 2.1 m and side slope is 1.5:1. Design appropriate cross drainage structure with determining the drainage waterway, canal waterway and bed and full supply level at four different sections of the canal trough.

The canal (QQ = 30 m³/s) crosses a drainage of QQ = 550 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.

Assumptions: Bed level 310.0 m is the downstream canal bed; general ground level = canal bed = 310.0 m; Lacey's ff = 1; concrete trough nn = 0.015. The 50-year flood (550 m³/s) is the design flood.

1. Type of structure

HFL of the drainage (311.00 m) is above the canal bed (310.00 m) by 1.00 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 311.00 − 308.00 = 3.00 m.

2. Drainage waterway

Lacey's regime perimeter (for a natural stream):

P=4.75Q=4.75550=111.4 mP = 4.75\sqrt{Q} = 4.75\sqrt{550} = 111.4\ \text{m}

Provide 12 spans of 10 m with piers 1.5 m thick: clear waterway = 12 × 10 = 120 m (> 111.4 m). Overall length = 120 + 11 × 1.5 = 136.5 m.

Approach velocity at HFL = Q/(L·d) = 550/(120 × 3.00) = 1.53 m/s (the velocity through the barrels is checked at the end). Lacey's regime depth R=0.47(Q/f)1/3R = 0.47(Q/f)^{1/3} = 3.85 m (with ff = 1); foundations of piers and abutments are taken about 1.5R = 5.8 m below HFL, with cut-offs and aprons for scour.

3. Canal waterway (flumed rectangular trough)

Normal canal: area A1=(B+zD)DA_1=(B+zD)D = (30 + 1.5 × 2.1) × 2.1 = 69.61 m², V1V_1 = 30/69.61 = 0.431 m/s, hv1=V12/2gh_{v1}=V_1^2/2g = 0.0095 m. Top width T=B+2zDT=B+2zD = 36.30 m.

To save cost, the canal is flumed to a rectangular trough of width BtB_t = 8 m, with the same full supply depth 2.1 m (the trough is as long as the drainage waterway, 136.5 m).

  • Trough area = 8 × 2.1 = 16.80 m²; VtV_t = 30/16.80 = 1.786 m/s (acceptable, < 2.5 m/s); hvth_{vt} = 0.1625 m
  • Froude number = 0.39 < 1, flow is subcritical, so there is no hydraulic jump.
  • Hydraulic radius R=A/PR=A/P = 16.80/12.20 = 1.377 m; friction slope S=(nV/R2/3)2S=(nV/R^{2/3})^2 = 0.000468 (Manning's n = 0.015); friction loss in trough hf=S Lh_f=S\,L = 0.000468 × 136.5 = 0.064 m

4. Transitions and levels

  FSL ---.                            .--- FSL
         '--.______________________.--'
  bed ---.                            .--- bed
         '--.______________________.--'
  normal  inlet     flumed trough     outlet  normal
  canal   (2:1)                      (3:1)   canal

Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:

  • Inlet length = 2 × (T − B_t)/2 = 36.30 − 8 = 28.3 m
  • Outlet length = 3 × (T − B_t)/2 = 42.4 m

Bed level at the downstream canal is fixed (310.00 m). Working backwards with Bernoulli's equation (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v):

W2=W1+hv1−hvt−0.3(hvt−hv1)W3=W2−hfW4=W3+hvt−hv1−0.5(hvt−hv1)\begin{aligned} W_2 &= W_1 + h_{v1} - h_{vt} - 0.3(h_{vt}-h_{v1}) \\ W_3 &= W_2 - h_f \\ W_4 &= W_3 + h_{vt} - h_{v1} - 0.5(h_{vt}-h_{v1}) \end{aligned}

W1W_1 = 312.286 m, so W2W_2 = 312.087 m, W3W_3 = 312.023 m, W4W_4 = 312.100 m. Trough bed = water level − 2.1 m.

SectionLocationBed level (m)FSL (m)
1Normal canal, start of inlet transition310.186312.286
2End of inlet transition = start of trough309.987312.087
3End of trough = start of outlet transition309.923312.023
4End of outlet transition = normal canal310.000312.100

Total loss of head = 312.286 − 312.100 = 0.186 m, so the canal bed downstream of the work is 0.186 m lower than upstream.

Check: with a trough slab 0.6 m thick, the soffit of the barrels = 309.923 − 0.6 = 309.32 m, only 1.32 m above the drainage bed, while HFL stands 1.68 m above the soffit, so the barrels run full under pressure. With 1.32 m clear height the barrel velocity would be 550/(120 × 1.32) = 3.47 m/s, which is too high. The drainage bed under the barrels is therefore depressed to RL 307.52 m (1.8 m clear height) with 1 in 4 slopes at both ends, giving a barrel velocity of 550/(120 × 1.8) = 2.55 m/s, which is acceptable.

Answer: drainage waterway 120 m clear (12 × 10 m, overall 136.5 m); canal flumed to 8 m wide trough; bed/FSL at the four sections = 310.19/312.29, 309.99/312.09, 309.92/312.02, 310.00/312.10 m.

✓ Answer checked by Claude Opus 5.5 (high effort)

All Irrigation and Drainage Engineering chapter 8 questions →