A siphon aqueduct with 11 spans of 10 m (110 m clear waterway) passes 450 m³/s drainage. Canal flumed to 13 m wide rectangular trough (2.1 m depth) over 125.0 m. Four section levels: 1) Bed 160.000, FSL 162.100; 2) Bed 159.812, FSL 161.912; 3) Bed 159.761, FSL 161.861; 4) Bed 159.833, FSL 161.933. Total head loss 0.167 m.

The cross-drainage structure across an irrigation channel has following data: Discharge of canal = 50 cumec; Bed width of canal = 30 m; Full supply depth of canal = 2.1 m; Bed level of the canal = 160.00 m; Side slope of canal = 1.5:1 (H:V); High flood discharge of drainage = 450 cumec; High flood level of drainage = 161.00 m; Bed level of drainage = 158.00 m; General ground level = 160.00 m. Design the drainage waterway and canal waterway and find the bed levels and FSL at four different sections of the canal trough.

The canal (QQ = 50 m³/s) crosses a drainage of QQ = 450 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.

Assumptions: Lacey's ff = 1, concrete trough with nn = 0.015, piers 1.0–1.5 m thick, slab thickness 0.6 m.

1. Type of structure

HFL of the drainage (161.00 m) is above the canal bed (160.00 m) by 1.00 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 161.00 − 158.00 = 3.00 m.

2. Drainage waterway

Lacey's regime perimeter (for a natural stream):

P=4.75Q=4.75450=100.8 mP = 4.75\sqrt{Q} = 4.75\sqrt{450} = 100.8\ \text{m}

Provide 11 spans of 10 m with piers 1.5 m thick: clear waterway = 11 × 10 = 110 m (> 100.8 m). Overall length = 110 + 10 × 1.5 = 125.0 m.

Approach velocity at HFL = Q/(L·d) = 450/(110 × 3.00) = 1.36 m/s (the velocity through the barrels is checked at the end). Lacey's regime depth R=0.47(Q/f)1/3R = 0.47(Q/f)^{1/3} = 3.60 m (with ff = 1); foundations of piers and abutments are taken about 1.5R = 5.4 m below HFL, with cut-offs and aprons for scour.

3. Canal waterway (flumed rectangular trough)

Normal canal: area A1=(B+zD)DA_1=(B+zD)D = (30 + 1.5 × 2.1) × 2.1 = 69.61 m², V1V_1 = 50/69.61 = 0.718 m/s, hv1=V12/2gh_{v1}=V_1^2/2g = 0.0263 m. Top width T=B+2zDT=B+2zD = 36.30 m.

To save cost, the canal is flumed to a rectangular trough of width BtB_t = 13 m, with the same full supply depth 2.1 m (the trough is as long as the drainage waterway, 125.0 m).

  • Trough area = 13 × 2.1 = 27.30 m²; VtV_t = 50/27.30 = 1.832 m/s (acceptable, < 2.5 m/s); hvth_{vt} = 0.1710 m
  • Froude number = 0.40 < 1, flow is subcritical, so there is no hydraulic jump.
  • Hydraulic radius R=A/PR=A/P = 27.30/17.20 = 1.587 m; friction slope S=(nV/R2/3)2S=(nV/R^{2/3})^2 = 0.000408 (Manning's n = 0.015); friction loss in trough hf=S Lh_f=S\,L = 0.000408 × 125.0 = 0.051 m

4. Transitions and levels

  FSL ---.                            .--- FSL
         '--.______________________.--'
  bed ---.                            .--- bed
         '--.______________________.--'
  normal  inlet     flumed trough     outlet  normal
  canal   (2:1)                      (3:1)   canal

Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:

  • Inlet length = 2 × (T − B_t)/2 = 36.30 − 13 = 23.3 m
  • Outlet length = 3 × (T − B_t)/2 = 34.9 m

Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):

W2=W1+hv1−hvt−0.3(hvt−hv1)W3=W2−hfW4=W3+hvt−hv1−0.5(hvt−hv1)\begin{aligned} W_2 &= W_1 + h_{v1} - h_{vt} - 0.3(h_{vt}-h_{v1}) \\ W_3 &= W_2 - h_f \\ W_4 &= W_3 + h_{vt} - h_{v1} - 0.5(h_{vt}-h_{v1}) \end{aligned}

W1W_1 = 162.100 m, so W2W_2 = 161.912 m, W3W_3 = 161.861 m, W4W_4 = 161.933 m. Trough bed = water level − 2.1 m.

SectionLocationBed level (m)FSL (m)
1Normal canal, start of inlet transition160.000162.100
2End of inlet transition = start of trough159.812161.912
3End of trough = start of outlet transition159.761161.861
4End of outlet transition = normal canal159.833161.933

Total loss of head = 162.100 − 161.933 = 0.167 m, so the canal bed downstream of the work is 0.167 m lower than upstream.

Check: with a trough slab 0.6 m thick, the soffit of the barrels = 159.761 − 0.6 = 159.16 m, only 1.16 m above the drainage bed, while HFL stands 1.84 m above the soffit, so the barrels run full under pressure. Since the clear height is less than 1.5 m, the drainage bed under the barrels is depressed to RL 157.66 m (1.5 m clear height) with 1 in 4 slopes at both ends. Barrel velocity = 450/(110 × 1.5) = 2.73 m/s, which is acceptable.