Cross drainage: Q 50, HFD 450, uplift on roof
Short answer
Drainage waterway: 11 spans of 10 m, clear waterway 110 m. Canal waterway: flumed trough 19 m wide, 1.5 m deep. Inlet transition 2:1 splay 15.5 m; outlet 3:1 splay 23.2 m. Bed levels: 100.000, 99.867, 99.806, 99.857 m. Uplift pressure on roof = (100.50 − 99.21) × 9.81 ≈ 12.7 kN/m².
Design the following components of a suitable C/D work for the following data. Discharge of canal = 50 m³/s, Bed width of canal = 30 m, Depth of water in canal = 1.5 m, Bed level of canal = 100.0 m, High flood discharge of drain = 450 m³/s, High flood level of drainage = 100.50 m, Bed level of drainage = 98.8 m, General ground level = 100.0 m. (i) Design of drainage water-way (ii) Design of canal water way (iii) Design of transition and (iv) Uplift pressure on the roof.
The canal ( = 50 m³/s) crosses a drainage of = 450 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Side slope 1.5:1; Lacey's = 1; trough = 0.015; roof (trough) slab 0.6 m thick, unit weight of concrete 24 kN/m³; barrel = 0.015; barrel length ≈ trough width + walls ≈ 20 m.
1. Type of structure
HFL of the drainage (100.50 m) is above the canal bed (100.00 m) by 0.50 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 100.50 − 98.80 = 1.70 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 11 spans of 10 m with piers 1.5 m thick: clear waterway = 11 × 10 = 110 m (> 100.8 m). Overall length = 110 + 10 × 1.5 = 125.0 m.
Check: mean velocity = Q/(L·d) = 450/(110 × 1.70) = 2.41 m/s. Lacey's regime depth = 3.60 m (with = 1); foundations of piers and abutments are taken about 1.5R = 5.4 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (30 + 1.5 × 1.5) × 1.5 = 48.38 m², = 50/48.38 = 1.034 m/s, = 0.0545 m. Top width = 34.50 m.
To save cost, the canal is flumed to a rectangular trough of width = 19 m, with the same full supply depth 1.5 m (the trough is as long as the drainage waterway, 125.0 m).
- Trough area = 19 × 1.5 = 28.50 m²; = 50/28.50 = 1.754 m/s (acceptable, < 2.5 m/s); = 0.1569 m
- Froude number = 0.46 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 28.50/22.00 = 1.295 m; friction slope = 0.000490 (Manning's n = 0.015); friction loss in trough = 0.000490 × 125.0 = 0.061 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 34.50 − 19 = 15.5 m
- Outlet length = 3 × (T − B_t)/2 = 23.2 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 101.500 m, so = 101.367 m, = 101.306 m, = 101.357 m. Trough bed = water level − 1.5 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 100.000 | 101.500 |
| 2 | End of inlet transition = start of trough | 99.867 | 101.367 |
| 3 | End of trough = start of outlet transition | 99.806 | 101.306 |
| 4 | End of outlet transition = normal canal | 99.857 | 101.357 |
Total loss of head = 101.500 − 101.357 = 0.143 m, so the canal bed downstream of the work is 0.143 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 99.21 m, i.e. 0.41 m above the drainage bed; HFL stands 1.29 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 97.71 m (1.5 m clear height) with a 1 in 4 slope at both ends.
Uplift on the roof (trough slab)
The critical case is the canal dry with the drainage at HFL. Barrels: 11 openings of 10 m × 1.5 m (bed depressed), area 165 m², = 450/165 = 2.73 m/s, = 0.379 m; = 15/23 = 0.652 m.
Upstream HFL = d/s HFL + entry loss () + exit loss () + = 100.50 + 0.569 + 0.059 = 101.13 m (afflux 0.63 m).
The maximum uplift is just inside the entry (upstream end of the roof): pressure head = 101.128 − 1.5 × 0.379 − 99.206 (soffit) = 1.35 m, so the uplift pressure = 9.81 × 1.353 = 13.3 kN/m².
Downward load = slab weight 24 × 0.6 = 14.4 kN/m² plus canal water 9.81 × 1.5 = 14.7 kN/m², total 29.1 kN/m².
The uplift (13.3) is less than the slab weight alone (14.4), so the roof does not lift even with the canal dry; the net downward load with the canal running = 15.8 kN/m². The slab is reinforced for bending under these loads.
Answer: drainage waterway 110 m clear (11 × 10 m, overall 125.0 m); canal flumed to 19 m wide trough; bed/FSL at the four sections = 100.00/101.50, 99.87/101.37, 99.81/101.31, 99.86/101.36 m; maximum uplift on the roof 13.3 kN/m² (less than the 14.4 kN/m² slab weight).
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cross drainage: Q 50, HFD 400, d 1.55 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 450 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 25, uplift on roof of barrel · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 550 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, bed 35 m, FSD 1.6 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 30, HFL 311 m · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 30, bed 24 m · Irrigation and Drainage Engineering, chapter 8
- Gravity dam stresses with drainage gallery uplift · Hydropower Engineering, chapter 4
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6
- Uplift force with and without drainage gallery · Hydro Power, chapter 4
- Hydrostatic thrust and uplift with drainage gallery · Hydro Power, chapter 4
All Irrigation and Drainage Engineering chapter 8 questions →