- Asked 2/34
- 2072 Asoj · 10 marks
Cross drainage: Q 50, bed 35 m, FSD 1.6
Short answer
Siphon aqueduct adopted as HFL (211.0m) > canal bed (210.3m). Drainage waterway: 12 spans of 8m (clear 96m) via Lacey's formula. Canal flumed to 17m wide rectangular trough (1.6m depth). Transitions: inlet 2:1 (22.8m), outlet 3:1 (34.2m). Bed levels/FSL: Sec1 (210.300/211.900), Sec2 (210.122/211.722), Sec3 (210.067/211.667), Sec4 (210.135/211.735). Head loss 0.165m.
Following data are obtained at the crossing of a canal and drainage. Canal Data: Discharge: 50 cumec, Full supply depth: 1.6 m, Bed width: 35 m, Bed level: 210.3 m, Side slope: 1.5H:1V. Drainage Data: Discharge: 400 cumec, HFL: 211.0 m, Bed level: 208.5 m, General ground level: 210.5 m. Design the drainage waterway, canal waterway and find the bed levels and FSL at four different sections of the canal trough.
The canal ( = 50 m³/s) crosses a drainage of = 400 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Lacey's = 1; trough = 0.015; slab 0.6 m.
1. Type of structure
HFL of the drainage (211.00 m) is above the canal bed (210.30 m) by 0.70 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 211.00 − 208.50 = 2.50 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 12 spans of 8 m with piers 1.2 m thick: clear waterway = 12 × 8 = 96 m (> 95.0 m). Overall length = 96 + 11 × 1.2 = 109.2 m.
Check: mean velocity = Q/(L·d) = 400/(96 × 2.50) = 1.67 m/s. Lacey's regime depth = 3.46 m (with = 1); foundations of piers and abutments are taken about 1.5R = 5.2 m below HFL, with cut-offs and aprons for scour.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (35 + 1.5 × 1.6) × 1.6 = 59.84 m², = 50/59.84 = 0.836 m/s, = 0.0356 m. Top width = 39.80 m.
To save cost, the canal is flumed to a rectangular trough of width = 17 m, with the same full supply depth 1.6 m (the trough is as long as the drainage waterway, 109.2 m).
- Trough area = 17 × 1.6 = 27.20 m²; = 50/27.20 = 1.838 m/s (acceptable, < 2.5 m/s); = 0.1722 m
- Froude number = 0.46 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 27.20/20.20 = 1.347 m; friction slope = 0.000511 (Manning's n = 0.015); friction loss in trough = 0.000511 × 109.2 = 0.056 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 39.80 − 17 = 22.8 m
- Outlet length = 3 × (T − B_t)/2 = 34.2 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 211.900 m, so = 211.722 m, = 211.667 m, = 211.735 m. Trough bed = water level − 1.6 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 210.300 | 211.900 |
| 2 | End of inlet transition = start of trough | 210.122 | 211.722 |
| 3 | End of trough = start of outlet transition | 210.067 | 211.667 |
| 4 | End of outlet transition = normal canal | 210.135 | 211.735 |
Total loss of head = 211.900 − 211.735 = 0.165 m, so the canal bed downstream of the work is 0.165 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 209.47 m, i.e. 0.97 m above the drainage bed; HFL stands 1.53 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 207.97 m (1.5 m clear height) with a 1 in 4 slope at both ends.
Answer: drainage waterway 96 m clear (12 × 8 m, overall 109.2 m); canal flumed to 17 m wide trough; bed/FSL at the four sections = 210.30/211.90, 210.12/211.72, 210.07/211.67, 210.13/211.73 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cross drainage: Q 25, HFD 360 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 40, 45 cumec drainage · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 30, HFL 311 m · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 50, HFD 550 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage: Q 50, HFD 450 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 60, bed 35 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 50, bed 32 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Side-long ground hill road, 0-400 m · Estimating and Costing, chapter 6
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6
All Irrigation and Drainage Engineering chapter 8 questions →