- 2072 Magh · 6 marks
Cross drainage: Q 40, 45 cumec drainage
Short answer
Siphon aqueduct with drainage waterway 36 m clear (6@6 m spans). Canal flumed to 14 m wide trough, depth 1.6 m; inlet 20.8 m (2:1), outlet 31.2 m (3:1). Critical levels: bed/FSL: 206.40/208.00, 206.23/207.83, 206.21/207.81, 206.27/207.87 m.
Design a suitable cross drainage (water way, bed levels of different section and design of transitions) works if the following data at the crossing of a canal and drainage are given. Canal: Q = 40 m³/s, Bed width = 30 m, FSD of canal = 1.6 m, Bed level = 206.4 m, Side slope = 1½ H:1V. Drainage: Q = 45 m³/s, HFL = 207 m, Bed level = 204.5 m, General ground level = 206.50 m.
The canal ( = 40 m³/s) crosses a drainage of = 45 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.
Assumptions: Lacey's = 1; trough = 0.015; slab 0.6 m.
1. Type of structure
HFL of the drainage (207.00 m) is above the canal bed (206.40 m) by 0.60 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A siphon aqueduct is suitable. Drainage depth at HFL = 207.00 − 204.50 = 2.50 m.
2. Drainage waterway
Lacey's regime perimeter (for a natural stream):
Provide 6 spans of 6 m with piers 1.0 m thick: clear waterway = 6 × 6 = 36 m (> 31.9 m). Overall length = 36 + 5 × 1.0 = 41.0 m.
Check: mean velocity = Q/(L·d) = 45/(36 × 2.50) = 0.50 m/s. Lacey's regime depth = 1.67 m (with = 1); 1.5R = 2.5 m below HFL gives RL 204.5 m, which is only at the natural bed and above the depressed floor under the barrels (204.11 m, see below), so scour does not govern; the foundations of piers and abutments are taken at least 1.5 m below the depressed floor (about RL 202.6 m), with cut-offs and aprons.
3. Canal waterway (flumed rectangular trough)
Normal canal: area = (30 + 1.5 × 1.6) × 1.6 = 51.84 m², = 40/51.84 = 0.772 m/s, = 0.0303 m. Top width = 34.80 m.
To save cost, the canal is flumed to a rectangular trough of width = 14 m, with the same full supply depth 1.6 m (the trough is as long as the drainage waterway, 41.0 m).
- Trough area = 14 × 1.6 = 22.40 m²; = 40/22.40 = 1.786 m/s (acceptable, < 2.5 m/s); = 0.1625 m
- Froude number = 0.45 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius = 22.40/17.20 = 1.302 m; friction slope = 0.000504 (Manning's n = 0.015); friction loss in trough = 0.000504 × 41.0 = 0.021 m
4. Transitions and levels
FSL ---. .--- FSL
'--.______________________.--'
bed ---. .--- bed
'--.______________________.--'
normal inlet flumed trough outlet normal
canal (2:1) (3:1) canal
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 34.80 − 14 = 20.8 m
- Outlet length = 3 × (T − B_t)/2 = 31.2 m
Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):
= 208.000 m, so = 207.828 m, = 207.807 m, = 207.874 m. Trough bed = water level − 1.6 m.
| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 206.400 | 208.000 |
| 2 | End of inlet transition = start of trough | 206.228 | 207.828 |
| 3 | End of trough = start of outlet transition | 206.207 | 207.807 |
| 4 | End of outlet transition = normal canal | 206.274 | 207.874 |
Total loss of head = 208.000 − 207.874 = 0.126 m, so the canal bed downstream of the work is 0.126 m lower than upstream.
Check: with trough slab 0.6 m thick, soffit of the barrels = 205.61 m, i.e. 1.11 m above the drainage bed; HFL stands 1.39 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 204.11 m (1.5 m clear height) with a 1 in 4 slope at both ends.
Answer: drainage waterway 36 m clear (6 × 6 m, overall 41.0 m); canal flumed to 14 m wide trough; bed/FSL at the four sections = 206.40/208.00, 206.23/207.83, 206.21/207.81, 206.27/207.87 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Cross drainage: Q 50, bed 35 m, FSD 1.6 · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Cross drainage waterway and transitions, Q 56 · Irrigation and Drainage Engineering, chapter 8
- Syphonic aqueduct canal waterway levels, Q 40 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: Q 30, HFL 311 m · Irrigation and Drainage Engineering, chapter 8
- Cross drainage (flumed): canal 30, drainage 200 · Irrigation and Drainage Engineering, chapter 8
- Cross drainage: canal 300, drainage 500 · Irrigation and Drainage Engineering, chapter 8
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6