- 2071 Bhadra · 8 marks
Syphonic aqueduct canal waterway levels, Q 40
Short answer
Bed/water levels: normal canal: 150.00/151.50 m; start of trough: 149.83/151.33 m; end of trough: 149.76/151.26 m; normal canal outlet: 149.83/151.33 m. (Canal flumed to 15 m wide trough, trough length 125 m, friction loss 0.066 m.)
Determine bed and water levels at four critical locations of the canal water way at transition of Syphonic Aqueduct designed with the following data. Canal: Full supply discharge = 40 m³/s; Full supply level = 151.8 m; Side slope = 1.5:1; Depth of water = 1.5 m; Bed level = 150.00 m; Bed width = 32 m. Drainage: Maximum flood discharge = 520 m³/s; High flood level = 150.6 m; Bed level = 148.2 m; Normal ground level = 150.00 m.
At a syphonic aqueduct the canal is flumed into a rectangular trough over the drainage barrels. The levels follow from Bernoulli's equation between the normal canal and the trough, allowing losses of 0.3 Δh_v in the contraction (inlet) and 0.5 Δh_v in the expansion (outlet).
Assumptions: The data are inconsistent: FSL 151.8 m − bed 150.00 m = 1.8 m, but the depth is given as 1.5 m. The depth 1.5 m and bed 150.00 m are used, so the FSL is 151.50 m. (If instead the FSL 151.8 m and depth 1.5 m are taken as correct, the bed is at 150.30 m and every bed and water level in the table rises by 0.30 m.) Trough = 0.015.
Normal canal
= 51.38 m², = 40/51.38 = 0.779 m/s, = 0.0309 m, FSL = 150.00 + 1.5 = 151.50 m.
Trough
Drainage waterway by Lacey: = 108.3 m, so the trough is about 125.0 m long (11 spans of 10 m, piers 1.5 m). Canal flumed to = 15 m, depth 1.5 m:
- = 40/(15 × 1.5) = 1.778 m/s, = 0.1611 m, Froude number 0.46 (subcritical)
- = 1.250 m, = 0.000528 (n = 0.015), = 0.000528 × 125.0 = 0.066 m
- Inlet length (2:1 splay) = T − B_t = 36.50 − 15 = 21.5 m; outlet length (3:1 splay) = 32.3 m
Levels at the four sections
| Section | Location | Bed level (m) | Water level (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 150.000 | 151.500 |
| 2 | Start of trough (end of inlet) | 149.831 | 151.331 |
| 3 | End of trough (start of outlet) | 149.765 | 151.265 |
| 4 | Normal canal, end of outlet transition | 149.830 | 151.330 |
Total head lost in the work = 151.500 − 151.330 = 0.170 m. Trough bed = water level − 1.5 m.
Check: with a 0.6 m slab the barrel soffit is at 149.16 m, below the HFL of 150.60 m by 1.44 m, so the barrels run full (syphonic).
Answer: bed/water levels = 150.00/151.50, 149.83/151.33, 149.76/151.26, 149.83/151.33 m.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Syphonic aqueduct levels, Q 36 · Irrigation and Drainage Engineering, chapter 8
- Siphon aqueduct: Q 50, bed 32 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 60, bed 35 m · Irrigation and Drainage Engineering, chapter 8 · asked 2×
- Siphon aqueduct: Q 30, bed 24 m · Irrigation and Drainage Engineering, chapter 8
- Weir waterway and crest levels, 16000 m3/s · Irrigation and Drainage Engineering, chapter 5
- Siphon aqueduct: Q 20, drainage 200 · Irrigation and Drainage Engineering, chapter 8
- Bed slope for critical normal depth · Hydraulics, chapter 7
- Critical depth in four channel sections · Hydraulics, chapter 7
- Trapezoidal to rectangular transition with bed lowering · Hydraulics, chapter 7
- Canal earthwork, bed 3 m, free board 0.44 m · Estimating and Costing, chapter 6
All Irrigation and Drainage Engineering chapter 8 questions →