- 2073 Bhadra · 6 marks
Weir waterway and crest levels, 16000 m3/s
Short answer
Total waterway 600 m (undersluices 46 m, weir 554 m). Weir crest ~200.4 m (gates pond level 203.5 m); undersluice crest 200.0 m; head regulator crest 201.5 m with clear waterway ~42 m.
A river carries a high flood discharge of 16000 m³/s with its average bed level at 200.0 m. A canal carrying 200 m³/s is to take off from the headworks. The full supply level of the canal at its head is 203.0 m. The high flood level before construction is 205.7 m and Lacey's silt factor is equal to unity. Fix suitable values for the waterway and crest levels of weir, undersluices and canal head regulator. Assume suitably any other data if required.
Assumptions
Afflux m, loss through the head regulator m, weir coefficient (), average bed level m, undersluice discharge intensity about 10 m³/s/m. Velocity of approach is neglected.
1. Waterway (Lacey)
Discharge intensity m³/s/m; scour depth m.
2. Levels
- HFL before construction m; HFL after construction m.
- Pond level FSL regulator loss m.
- Head needed to pass the flood over the full waterway: m.
- Weir (open-flood) crest level m, say 200.4 m (only about 0.4 m above the bed). The structure is therefore a gated barrage: gates (3.1 m high) hold the pond at 203.5 m.
- Undersluice crest level river bed 200.0 m.
- Head regulator crest level undersluice crest 1.5 m 201.5 m (the canal FSL of 203.0 m gives 1.5 m depth over the crest).
3. Waterway distribution
Undersluice discharge canal discharge m³/s, so the width m, taken as 5 bays of 8 m with 4 piers of 1.5 m: m. Weir bays: m.
Head regulator: head over its crest pond level crest m, so
Provide about 42 m clear waterway (more if the partly drowned flow is allowed for).
Answer: Total waterway 600 m (undersluices 46 m, weir 554 m); weir crest m (gates raise the pond to 203.5 m); undersluice crest 200.0 m; head regulator crest 201.5 m with about 42 m clear waterway.
✓ Answer checked by Claude Opus 5.5 (high effort)
Related questions
- Syphonic aqueduct canal waterway levels, Q 40 · Irrigation and Drainage Engineering, chapter 8
- Waterway and crest level at alluvial zone · Irrigation and Drainage Engineering, chapter 5
- Canal head regulator design, Q 200 · Irrigation and Drainage Engineering, chapter 7
- Canal head regulator design, Q 150 · Irrigation and Drainage Engineering, chapter 7
- Crest level of fall, Q 30 m3/s · Irrigation and Drainage Engineering, chapter 7
- Weir design by Bligh's theory, 3200 m3/s · Irrigation and Drainage Engineering, chapter 5
- Design: 200 m head plant, bus MVA levels · Power Plant Design, chapter 4 · asked 14×
- Slope-area flood discharge, Marin River at Kusuntar · Engineering Hydrology, chapter 4
- Phreatic line and discharge (crest 300 masl) · Hydropower Engineering, chapter 4 · asked 2×
- Components of a medium head high discharge plant · Power Plant Design, chapter 3 · asked 2×
All Irrigation and Drainage Engineering chapter 5 questions →